My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42716
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:31 PM
Creation date
11/23/2007 11:56:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
General Documents
Doc Date
11/2/1981
Doc Name
BOURG MINE INSPECTION REPORT DATED NOV 5 1981 AND YOUR LETTER DATED NOV 9 1981
From
FLATIRON COMPANIES
To
MLR
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ~~~~ <br />COMPANIES <br />I <br />~ POST OFFICE BOX 429, BOULDER, COLORADO 80306 PHONE: (303) dd4-2151 <br />1 <br />' November 16 , 1981 b ; ,' '-; - ; ; <br />Mr. Mike Savage <br />' Mined Land Reclamation ;;'i'~; .`.' 1981 <br />` 923 Centennial Building <br />- 1313 Sherman Street ~ ,"..) !'; rl !l"n,a i1;iN <br />Denver, CO 80203 ,,~ ; <br />Re: Bourg Mine inspection report dated November 5, 1981 and <br />your letter dated November 9, 1981 <br />Dear Mike: <br />The Walden Coal Company requests that it not be required to complete <br />the construction of sediment pond "C" at this time. Walden Coal would like <br />to undertake further research to detern~ine the feasibility of the present pond <br />"C" plan. <br />j As you have observed during your inspections, the pond and dam, less <br />I the spillway, have been constructed. As an interim measure, Walden Coal <br />would propose to construct a ditch from pond "C" to sump "B" . This ditch would <br />carry the pond "C" outflow, insuring that sediment would have adequate <br />I opportunity to settle, <br />Walt and I appreciate tiie time you and Fred spent with us on November 9th. <br />We felt the meeting improved the relationship between tl~e MLRD and Walden <br />Coal. We are committed to keeping the communications open with the MLRD. <br />Sincerely, <br />___ , i~ <br />Scott A. Patten <br />Vice Presir]ent <br />
The URL can be used to link to this page
Your browser does not support the video tag.