My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42688
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:28 PM
Creation date
11/23/2007 11:55:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
General Documents
Doc Date
1/13/1986
Doc Name
MEETING OF JANUARY 8 1986 FN 79-177
From
MLRD
To
COLO YAMPA COAL CO
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />• • <br />Mr. Rick Mills - 3 - January 14, 1986 <br />maps based on 1985 aerial photography should also be included. The report <br />should be submitted by the end of February, 1986. As with the annual <br />hydrology report, we request that a minor revision be submitted specifying a <br />deadline for future report submittals. <br />Succession of Operators <br />Due to the recent corporate change, CYCC will need to apply fora permit <br />transfer (succession of operator) for both 79-177 and C-84-062. The <br />applications will need to address all requirements of Rule 2.08.6. We would <br />expect CYCC to address this item within a month. <br />Non-Contemporaneous Reclamation _ r~S,7~(/ ~y~~ su~M~~`--~ <br />We briefly discussed the status of the Area 9/10 Pit and the Area 2 Pit <br />reclamation. As you had indicated previously, CYCC will be requesting an <br />extension for completion of the Area 2 Pit. The extension request, including <br />a revised schedule, deadline for completion in 1986 and explanation of why the <br />schedule submitted in October, 1984 could not be met will need to be submitted <br />as a technical revision. The Technical Revision should be submitted within <br />two weeks. ~ <br />You indicated that backfilling of the Area 9/10 Pit had been completed. As <br />you are aware, there has been some concern on our part regarding whether or t- <br />not the final graded surface would achieve AOC. A comparison of approved <br />postmine topography and surveyed postmine topography (maps and cross sections) <br />for Area 9/10 should be submitted within two weeks. <br />If you, Claire or Terrell have any questions or comments regarding this <br />letter, please contact Bob Liddle or myself. <br />Sinter ly, <br />~~~~ <br />Dan Mathews <br />Reclamation Specialist <br />DM/srs <br />6486E <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.