Laserfiche WebLink
EARTHWORK ESTIMATING - RIPPING WORK <br />Tusk ~S <br />TASK DESCRIPTION: <br />2r(~ h4c~'~-LC~(I ~o~H a.-~:~[ :zr~us <br />HOURLY EQUIPMENT COST: <br />Machine make and model ~a'~ ~)-~(. attachments: ~-~(n~tuk rr.on2r <br />„ <br /> adjusted Operator Cost Per Hour <br /> <br />shift <br />no. hours <br />per <br />da days <br />per <br />meek base <br />rental <br />rate/hr. <br />operating <br />cost/hr base <br />wage <br />rate/hr <br />overtime <br />adjustment s ift <br />premium <br />adj. total <br />equip. <br />cost/hr <br />1 8 gfiS-`+`4 3'x_35 /~.x A N/A $ 138.0 <br />2 -- _~ <br />3 - - - <br />LOLd I = ~ ~ ~ g-'jam-~ <br />$ !;€.? o /hr. divided by _~ shifts/day = $ 138'.9 o average equipment cost/hr. <br />MATERIAL QUANTITIES: <br />Volume Method {bank material or,rock): BCY (total be ripped) <br />type of material /j//uQ seizmic ve ocity = /j/ fps <br />Area method (compacted fills, pavement) = Z 9/ 85 Z sq. ft. (total area) <br />ripping depth required to alleviate compaction = z ~ ' inches <br />Verification method(s) used S. ~ ac t /. S ~ c = ~. lac r~e s <br />HOURLY AROQUCTIOtI: <br />Volume method (for QRL, D9L, and D10 dozers w/single shank ipners only): <br />q~~/~ BCY/hr from aroduction graphs in_ Sic. V[I x /j/ /~ job efficiency (avq. for <br />a-T'f shits x~ altitude adj. _ /j//i¢ BCY/hr a ,lusted production <br />Area method (for dozers, track loaders or graders w/multi-shank rippers) <br />r s ~>~_ , sa. ft./hr (from oroductioP tahles in Section VII) x _6 3 job <br />e tic~ency avg. for all shifts) x ~~ /~ altitude adj. = 9o.c63.~ri sq. ft./hr <br />-,- <br />JOB TIME: <br />Volume method: ,~i/~ BCY divided by ////~ BCY/hr = ,1/~1 hrs <br />o ma vo ume atd. proms o Jt t ob time <br />Area method: ~91 $5 . sq. ft. divided by ?/~ $s~.=~/sq. ft/hr = ~ /? hrs <br />totem area ad,7. prod. tot. doh time <br />JOB COST: <br />/ L hrs x 3 ' : ~ `? O /hr = $ 5 > / ~f Total Job Cost <br />tot. job time avq. equip. cost <br />unit cost = 5 > ~ = -- divided by ;=~~ ~~ ~ _ $ S'S, _°~>,:,- <br />total job cost total vol. or area B ~or.%sq;z-ft. <br />