Laserfiche WebLink
-- <br />LANDFILL ENGINEERING - DELTA COUNTY <br />NORTH FORK LANDFILL <br />February 16, 1993 <br />The scope of work shall consist of determining the feasibility of the North <br />Fork Landfill to operate under Sbutitle D and, if feasible, to develop an <br />operation and closure pi an for the landfill. The work shall be divided into <br />two separate phases. Phase I shall decet'mine the feasibility of the North <br />Fork Landfill to operate under Subtitle D regulations. If Phase I proves <br />favorable to the continued operation of the North Fork Landfill under Su bCiCle <br />D, then engineering services shall consist of Phase II, Schedule A. If Phase <br />I determines Chat continued operation of the North Fork Land[ill is not <br />feasible, then engineering services shall consist of Phase II, Schedule B. <br />Ph++ee I <br />Provide preliminary design and feasibility study for operation of the North <br />Fork Landfill as the County's sole landfill under Subtitle D regulations. <br />Engineering services should address the following issues: <br />1. Evaluate the golf pile for use as landfill area and landfill cover <br />2. Determine minimum liner requirements. <br />3. Determine approximate life expectancy of the North Fork Landfill <br />given the disposal waste stream of the entire county. <br />4. Estimate the cost of upgrading the site to meet Subtitle D <br />standards. <br />TOTAL PH>1RC r. .. °' _ <br />Prepare an operational and closure plan for operating the North Fork Landfill <br />under the Subtitle D regulations. <br />TOTAL PHASE II, Schedule A: <br />Srhedule B <br />Prepare a closure plan for the North Fork Landfill to be implemented for a <br />September 15, 1993 closure: <br />. ~~ <br />I' <br />~1I <br />~~ <br />TOTAL PHASE II, Schedule B: <br />