Laserfiche WebLink
<br />-6- <br /> <br />Action: Approved 5/23/84 with conditions <br />Minor revision No. 3: Topsoil stockpile SE of active pit <br />submitted 7/2/1984) <br />Action: Approved 1/16/84 with conditions <br />Minor revision No. 4: Development drilling within permit area <br />su mute 7/20/1984) <br />Action: Approved 7/20/84 <br />Minor revision No. 5: Temporary topsoil stockpile N of active pit <br />submitted 8/17/1984) <br />Action: Approved 9/17/84 with conditions <br />r ~~ <br />~~ <br />v <br />Bonding <br />As a stipulation to Permit Revision No. 1 H-G was required to reevaluate <br />the bond and provide reclamation cost estimates to the Division. These <br />estimates were submitted to the Division on September 10, 1984 and <br />reviewed. The Division calculated the bond separately and concluded <br />that $2,357,767.00 was sufficient to cover the costs of reclamation at <br />the mine and load-out. H-G and the Division are currently working out <br />differences between calculated amounts. <br />