My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42457
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:03 PM
Creation date
11/23/2007 11:47:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
12/3/1992
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE REVISION DESCRIPTION OF CHANGE TO CONDITIONS <br />APPROVED NUMBER REVISION BOND COMPLIED <br /> LIABILITY WITH <br />2-6-91 MR-18 Increase in size of 0 <br /> coal stockpile <br />3-6-92 MR-19 Allowance for testing 0 <br /> and disposal of <br /> sludge from oil/water <br /> se arator <br />5-13-92 MR-20 Movement of small 0 <br /> to soil stockpile <br />7-1-92 MA-21 Addition of culvert 0 <br /> and the updating of <br /> Ma 26 <br />7-21-92 MR-22 Relocation of portion 0 <br /> of Amoco pipeline <br />7-27-92 MR-23 Updating ownership 0 <br /> and control portion <br /> of permit <br />8-17-92 MR-24 Change in Map 24 to 0 <br /> show relocation of <br /> Amoco pipeline <br />9-24-92 MR-25 Relocation of 0 <br /> explosives storage <br /> area <br />Section IV - Statue of Stioulat ions <br />The findings document for Permit Revision No. 1 in 1987 <br />stipulations remained form the 24 original stipulations <br />Three of these stipulations were fully satisfied before <br />on 9-6-88. Listed below are the three stipulations rem <br />findings document and the statue of each: <br />showed that six <br />to the 1983 permit. <br />the permit was renewed <br />aining from the 1988 <br />NUMBER STIPULATION ORIGIN DATE CONDITIONS <br /> COMPLIED <br /> WITH <br />6. THE DIVISION DIRECTS EMPIRE ENERGY 9-2-83 Empire <br /> CORPORATION, WITHIN 90 DAYS OF submitted a <br /> PERMIT ISSUANCE, TO SUBMIT TO THE report for <br /> DIVISION THE RESULTS OF THE SAMPLING overburden <br /> PROGRAM FOR ALL OVERBURDEN PROPOSED from SA <br /> TO BE USED FOR PLAN GROWTH MEDIA AS Portal area <br /> DESCRIBED IN THE 1983 FINDINGS <br /> DOCUMENT. BASED UPON THE RESULT OF <br /> THESE STUDIES, AND THE UTILIZATION <br /> OF ANY PROPOSED SOIL AMENDMENTS, THE <br /> APPLICANT SHALL DEMONSTRATE TO THE <br /> DIVISION'S SATISFACTION THAT THE <br /> PROPOSED OVERBURDEN IS AN ACCEPTABLE <br /> PLANT GROWTH MEDIA. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.