Laserfiche WebLink
May 24, 1995 • -3- • 943-2847 <br />The results from the analysis for the 50, 90 and 98 percentile flow rates for various heads are presented in <br />Table 2. Based on a review of these results it is recommended that linear interpolation be used to obtain <br />intermediate values. <br />Golder appreciates the ongoing opportunity to provide CC&V with technical support for the Cresson <br />Project. Pleaze contact the undersigned if you should have any questions or comments. <br />Sincerely, <br />,G~ol/der~Associates Inc. <br />Dirk van Zyl, P.E., Ph. D <br />Strategic D1uec[~or Mining <br />L <br />Teny Mandziak <br />Project Engineer <br />DVZlfM/tm <br />References <br />Bonaparte, R. et. al., 1987. Background Document on Proposed Liner and Leak Detection Rule, USEPA <br />Report EPA/530-SW-87-015 <br />Giroud, J. P., and Bonaparte, R., 1989. Leakage Through Liners Constntcted With Geomembrane -Part l: <br />Geomembrane Liners, Geotextile an Geomembranes (8) pp. 27-67, Elsevier Science Publishers Ltd., <br />England. <br />Van Zyl, D., 1990. Reliability Based Design of Heap Leach Pads and Ponds, In Proceedings 4th Western <br />Regional Conference on Precious Metals and the Environment, SME, Lead, South Dakota. <br />cc: Jim Komadina, CC&V <br />Golder Associates Inc. <br />