Laserfiche WebLink
<br />RIDER TO MINING PERMIT <br />Permit Date: December 12, 1990 <br />Permit No: C-89-074 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. O1 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT A <br />STATEMENT CERTIFIED BY A REGISTERED PROFESSIONAL ENGINEER ATTESTING <br />THAT THE SEDIMENT POND HAS BEEN CONSTRUCTED AS DESIGNED. IT SHOULD <br />AL50 INCLUDE HOW THE SEDIMENT STORAGE MONITORING IS GOING TO BE <br />IMPLEMENTED. <br />Stipulation No. 02 <br />THE OPERATOR WILL BE RESPONSIBLE FOR REPAIR OF ANY SUBSIDENCE WHICH <br />MIGHT OCCUR IN EXISTING UNDERGROUND WORKINGS WITHIN 250 FEET OF THE <br />STRIP PIT BOUNDARY. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />By <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />0695G <br />