Laserfiche WebLink
4 <br />Table of Contents (continued) <br />Page <br />XVIII. Coal Processing Waste and Non-Coal Processing Waste <br /> Rules 2.05.3(8), 7_.05.4(2)(f), 4.10 and 4,11 21 <br />XIX. Mine Facilities, Coal Handling Structures, Support Facilities; <br /> Roads; and Ponds, Impoundments and Diversions - Rules 2.05,3(3), <br /> 2,05,3(4), 2.05.3(7), 4.03, 4.04 and 4.05 21 <br /> A, Mine Facilities, Coal Handling Structures and Support <br /> Faci 1 i ti es. 21 <br /> B. Roads 21 <br /> C. Ponds, Impoundments and Diversions. 22 <br />XX. Bonding - Rules 2,05.4(2)(6) and 3 22 <br />XXI. Sealing of Dri11 Holes and Underground Openings - <br /> Ru1es 2,05.4(2)(8) and 4,07 23 <br />XXII, Subsidence - Rules 2,05.6(6) and 4,20 23 <br />XXIII, Special Categories of Mining Other Than AVF and Prime <br /> Farmland - Rules 2.06, 4.22, 4.23, 4.26, 4.27, and 4.29. 24 <br />XXIV, Miscellaneous Compliance - Rules 2,05.6(5), 4.02, 4,12, <br /> 4,19, 4,21, 4.28 and 4.30 <br />~ 24 <br />XXY, Operations on Land Subject to Limitations or <br />Prohibitions - <br /> Rules 2,03.7, 2.07,6(2)(d) and 2.10 24 <br />XXVI. Demonstration that Surface Coal Mining and Reclamation <br /> Operations can be Feasibly Accomplished - Rule 2.07,6(2)(6) 25 <br />XXVII. Compatibility with Anticipated Adjacent Operations - <br /> Rule 2.07,6(2)(1) <br />............ ...... .. 25 <br />XXVIII, Reclamation Fees Required by 30CFR, Chapter VII, Sub-chapter R - <br /> Rule - 2.07,6(2)(0) 25 <br />_i i_ <br />