My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42181
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:44 PM
Creation date
11/23/2007 11:38:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
10/27/1994
Doc Name
SPECIFICATION CHANGES CRIPPLE CREEK & VICTOR GOLD MINING CO CRESSON PROJECT FN M-80-244
From
DMG
To
CRIPPLE CREEK & VICTOR GOLD MINING CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f'' ~' ~ ~ ~II ~I~~I~~II~~~~ ~I~ <br />sss <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Resources <br />1313 Sherman St., Room 215 <br /> <br />Denver, Colorado 80203 1I~~~ <br /> <br />Phone: (303) 866-3567 I <br />FAX: (303)872-8106 <br /> DEPARTMENT OI <br /> NATURAI <br />October 27, 1994 RESOURCE; <br /> <br />Mr. John Hardaway Roy Romer <br />Governor <br />Environmental Manager Tames S. LOChhead <br /> <br />Cripple Creek and Victor Gold Executive Director <br /> <br />P. O. BOX 191 Michael B. Long <br />Dlvlsion Director <br />Victor, CO 80860-0191 <br />RE: Specification Changes, Cripple Creek and ViMor Gold Company, <br />Cresson Project, FYIe No. M-80-244 <br />Dear Mr. Hardaway: <br />The Division of Minerals and Geology has reviewed your letter dated October 24, 1994 <br />which summarized the specification changes requested to date by Cripple Creek and <br />Victor Gold during the ongoing construction of the Cresson Valley Heap Leach Phase I <br />Project. The following specification changes 1-10 have been approved by the Division. <br />Specification change No. 11 is still awaiting test results before fmal approval is granted. <br />1. The use of material from the Gold Star Pit for leak detection. <br />2. Use of material at the Gold Star Pit as pipe bedding and pipe cover in the underdrain <br />system. <br />3. The change in gradation from 8 inches to 12 inches maximum for underdrain bedding. <br />4. Changes in Valley Leach underdrain configuration for the underdrain pipe trench in <br />upstream one-half of the Valley Leach facility. <br />5. Gradation specification modification of the soil liner from 'k inch minus 2 inch <br />minus. <br />6. Changes in gradation specification for finger drains which show no visible flow. <br />f~ h.r-- <br />7. Removal of stacking limit of stockpiled geotextile on site. /, -~ 1 a~ ~~ <br />8. Cold weather seaming, winter closure, and spring start up plans. 4 l~ t ~~ '~ ~~~p ~/ ~,,~ <br />~ 77 <br />9. Design modification of structural fill thickness from I to 3 feet for upstream face of /~/l~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.