'000 Febmary 2000 Summary Pa a S-5 <br />>gY The Elk Creek Coal Lease Tract would also be mined by longwall techniques. The production on this <br />tract would also be at 5 million tons per year from the D coal seam. - <br />Under Altemative D, the applicant proposed to drill 25 exploration holes. Holes would be rotary drilled <br />ifs to predetermined depths, cased as necessary, and the coal zone would be cored. Since the release of <br />the Draft EIS, the applicant requested shifts on some of the drill hole locations. These proposed <br />relogtions were nol received in time to analyze in the EIS, or for the public to review and comment on <br />1 them. However, the EIS examined the broader effects of exploration in the delineated license area, <br />and pn be relied upon to assess granting the license and approve specific hole locations originally <br />submitted that were unchanged. <br />S-2.3 Altemative C -Multiple Seam Mining <br />This altemative is similar to Altemative B, with the inGusion of additional B seam coal reserves in the <br />Iron Point Coal Lease Tract, as well as additional surface area and reserves that are located between <br />rve the Iron Point and Elk Creek Coal Lease tracts. An area was also added to the Iron Point Coal Lease <br />Tract in the Terror Creek drainage to facilitate flexibility in locating entries beneath Terror Creek for <br />ns access to coal in the Bowie No. 1 'pod." In Altemative C, mining would be completed by longwall <br />techniques, and coal production would be the same as outlined in Altemative B. <br />S-2.4 Alternative D -Subsidence Protection <br />This altemative would be essentially the same as Altemative C, with the limitation that there would be <br />no subsidence under Terror or Hubbard creeks, or the Curecanti-Rifle 230/345 kV electric transmission <br />line. Based on continuing geologic analysis for the area, since the issuance of the Draft EIS, the <br />boundaries of the proposed Iron Point Coal Lease Tract have been modified. It appears that the B and <br />D coal seams thin and split into seams of unmineable thickness toward the northwest part of the tract. <br />In addition, the continuing analysis indicates that the igneous intrusions may have "burned" portions of <br />the B and D coal seams, leaving no mineable coal. Based on this re-evaluation of the lease tract, <br />there are approximately 5 million tons of coal less in Alternative D than originally estimated in the Draft <br />EIS. The re-alignment of the boundary also provides additional protection to Terror Creek Ditch and <br />Reservoir. <br />S-2.5 Preferred Alternative <br />m <br />rhis <br />e <br />~d <br />The responsible agencies have identified Altemative D as the a preferred altemative. Altemative D <br />provides for leasing with standard special coal lease stipulations, subsidence protection under <br />perennial drainages, and additional seams and acreage. In particular, the agencies have decided that <br />protection of perennial drainages would be necessary to maintain watershed integrity and ecosystem <br />health, so provisions in Altemative D offer protection for perennial drainages by eliminating subsidence <br />in those areas. Coal recovery for Altemative D would be estimated at approximately 60 million tons for <br />the two lease tracts. <br />For the Iron Point Coal Exploration License, the preferred Altemative is D with the exceptions <br />addressed in S-2.2, Alternative B -Proposed Action. Alternative B for the exploration license would <br />provide standard and special surface use stipulations to reduce potential surface impacts. <br />S-3.0 ENVIRONMENTAL ANALYSIS <br />This section of the EIS describes both the existing conditions of and the environmental consequences <br />to the area and its resources. Resource descriptions locus on areas which would likely be affected by <br />reasonably foreseeable mining and exploration activities. <br />Final Environmental Impact Statement <br />