My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42038
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:31 PM
Creation date
11/23/2007 11:33:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
2/16/1982
Doc Name
STREAM CHANNEL RELOCATION CHIMNEY ROCK COAL FILE C-023-81
From
CHIMNEY ROCK COAL
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ • <br />Further, the floodplain of Stollsteimer Creek, in the area of <br />the diversion will not be affected as a result .of the <br />relocation activities. The discussion and calculations <br />presented earlier indicate that the relocated channel is <br />adequately sized. Therefore, the combination channel, band <br />and floodplain should he adequate to pass the peak runoff for <br />]00 year 24 hour precipitation event. <br />The longitudinal profile of the existing stream channel was <br />also defined during the survey referenced above. The <br />relocated channel will follow its predecessors gradient, in <br />addition to maintaining the same length of channel. The <br />Cross-section P1ap, depicts the existing and relocated channel <br />profiles. <br />~ Stability of the relocated channel will be provided in that <br />said channel will meander in a similar fashion to the <br />existing channel as shown on the Location P~iap. Rip rap will <br />be placed along the entire length of the inside banks of the <br />channel as well as along the channel bottom. Rip rap to 15 <br />inches will he utilized along the banks and the channel <br />bottom. Further, rip rap will also be placed downstream of <br />the diversion to ensure stability o` the w~modified <br />downstream channel. The Location clap depicts the areas orhere <br />placement of rip rap will or_cur. SVell cemented sandstone <br />from the mine site will. be utilized as rip rap. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.