Laserfiche WebLink
Date Action Company Number Amount Estimated Required Total Bond <br /> of Bond Cost of Surety in Place <br /> Remaining <br /> Reclamation <br /> 20 Feb 96 Midterm Review 162,444 270,733 271,000 <br /> misstated <br /> as 207,733 <br /> throughout <br /> 167,131 270,733 271,000 <br /> 16 Feb 00 Replace Colo Nat Bank US Bank of Denver 9128275S7 171,000 167,131 270,733 271,000 <br /> 694071 <br /> ver9128275S7 <br /> 16 US Bank of Denver 9128275S7 172,575 3 272,575 <br /> 9128275S7 of 171,000 <br /> The needed surety raise fro 321,720 to $363,620 ($41,900) of Permit Renewal Number 1 was included in the $71,280 change in bond amount <br /> on the TR-08 Decision Form. <br /> The amount of reduction presented here are chronological, and are reversed from the amounts cited in the respective proposed decisions. <br /> Date Action Re aining Reclamation Cost Estimates Total <br /> Mine Site Loadout Portal 1 Dump Truck Siever's <br /> Road Ditch <br /> 7/14/83 Permit 1,750,000 <br /> 3/9/88 TR-7 527,500 231,800 45,000 804,300 <br /> 3/9/88 SL-01 47,920 45,000 25,000 117,920' <br /> 10/4/88 TR-08 47,920 144,300 45,000 25,000 162,220 <br /> 8/12/93 RN-02 105363 45,000 25,000 175,363 i <br /> 11/23/93 SL-03 15,453 145,000 <br />