My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42016
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:28 PM
Creation date
11/23/2007 11:33:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
6/3/1995
Doc Name
Memo on Getting an Exemption for Work Bid
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 `y` <br />~ <br /> <br />Denver, Colorado 80203 I <br />~~~ <br />~ <br />r <br />Phone: (303) 866-3567 III <br />FAX: 13031 832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />DATE: June 3, 1994 <br /> Roy Romer <br /> Governor <br />TO: Maggie VanCleef Ken saiazar <br />/' Executive Director <br />/ <br />FROM: Erica Crosby ~~/ Michael B. lonti <br /> Division Director <br />RE: Hawk's Nest Reclamation (C-81-016) <br />A few weeks ago, you notified me of the new procedures regarding <br />reclamation contracts. Apparently, the Division of Purchasing has <br />concluded that all bids above $15,000.00 must be issued as <br />"contracts" rather than "purchase orders". I am aware that the <br />Division of Purchasing as well as DMG has yet to figure out how to <br />write "contracts" for reclamation jobs, therefore, Purchasing has <br />allowed exemptions for projects under the 1994 construction season. <br />The coal program has one remaining reclamation project for the <br />Hawk's Nest Mine. As you recall, we opted to bid out the Silo <br />Demolition work as a separate job because of the nature of the job <br />as well as the possibility of having to write the bid as a <br />"contract". The remaining work includes some minor grading, <br />topsoil replacement, seeding, sealing a dozen or so methane gas <br />holes, and removal of 4 barrels of potentially hazardous material. <br />I have estimated that it will cost roughly $35,000.00 to do the <br />job. Based on this estimate, it falls into the definition of a <br />"contract", as defined by the Division of Purchasing. <br />In summary, I am requesting that you contact the Division of <br />Purchasing regarding an exemption for the remainder of the work at <br />the Hawk's Nest Mine. It is imperative that the work be conducted <br />during this project season due to the uncompleted work at the Silo <br />Area. <br />If you have any questions or need additional information, please <br />let me know. Thanks. <br />cc: Larry Routten <br />
The URL can be used to link to this page
Your browser does not support the video tag.