My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41988
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:27 PM
Creation date
11/23/2007 11:32:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
General Documents
Doc Date
2/23/2005
Doc Name
Info. Materials
From
Bill Janke
To
San Miguel County
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTlTGOMERY WATSON <br />~~~~ 1 <br />Apti1 12, 2000 <br /> <br /> <br />.11s. Melinda ~iictroL <br />Colorado Departtne:nt of Transportation <br />Region 5, T,~ffic and Safety Unit <br />3803 N. Main Avenue, Suite 100 <br />Du.~rtgo, CO 81301 <br />Re: Access fro¢t xt~tway 1?5 to Silver Bell Tailing Impoundment <br />Ms. Nchols <br />This letter is intended to provide supplemental information related t_o the enclosed Application fot <br />State i`ighway tlccess Permit. This temporary access improvement to Colorado i-~g`°a:sav 145 is <br />being requested to allow PacifiCorp to complete remediation wnrlc at the SiIverBe- T.tiliag <br />Impoundment owned by Mr. Lee Wynne. This rer~ediation work is being completed per the <br />Colorado Department of Public Health and Enviroa~nt Voluntary C7eannp Progrrm <br />To complete the remediation cover material will need to be imvoned foz the tailing impoundment. <br />It is anticipated that 10-wheel dump trucks will be used to haul this covet r_~aterial. -gppro~uately <br />6C taps per day w-ill be cotpleted with each truck having a loaded gross vehicle wei,ht of <br />approximately 48,000 pounds. In addition, approxitrnte!y 15 light vehicles will access the site on a <br />daily basis. The overall project duration is about 12 weeks, with the hauling of material being <br />completed over about 6 weeks during the Inter stages of the project. <br />The attached traffic control plan depicts the c~affic controls chat will be in place during the hauling <br />of material to the site:. For the remainder of the project signage will be used to as trtffic control. <br />17t: the attached trap, the properly owned by Lee Wynne that will require the temporary access is <br />shown highlighted in j2llow, with the access route from Iitghwav :4~ to the property highlighted <br />in green. This map contaizts additiettal information not relevant to this oermtt; howrver, stnce this <br />mapping was available froxn the CI.S. Forest Service it was included to show the property locations <br />for this access pemut. <br />If you have anyfw-ther questions, please contact me at 970-879-6260. <br />Sincerely, <br />1/Iontgomery~Wa~ts o~n~ <br />fo!tn V. Redmond, P.E. <br />Supervising Engineer <br />G 1 = 80 e~ , `vL ~HI~ God SSA <br />PO Rox 774U16 <br />i4/5 Pine Grove flaaU <br />tireamboar Swings. Cr•~nraJo <br />AUd]7 <br />tPi: 9~o at9 step <br />Fan. °/U a~99nae Serving fhe World: Sn vmormen ral Needs <br />!l .._.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.