Laserfiche WebLink
* Network Development Consultants, Ine.,'s turnkey project <br />* My responsibilities were as follows: <br />** Determine landowners involved in the proposed project for easement acquisition, <br />environmental review lk access. <br />** Create a database of the owner's information <br />** Prepazed detailed ownership line list <br />** Sent initial letter to landowners and followed up with phone call. <br />** Kept logs of landowner conversations and questions <br />** Met with landowmers that wanted a face to face meeting at their property . <br />** Obtained rights of entry for surveyors and environmental consultants <br />** Worked closely with environmental coordinator for access for their surveys <br />** Prepared new acquisition easements for re-route alternatives <br />** Obtained all new easements, temporary work space and access easements <br />AT&T - Lucin, UT to Red Bluff, CA Copper Cable Removal project <br />* 600+ mile Copper Cable Removal <br />* January, 1997 to October, 1997 <br />* Forkert Engineering & Surveying's turnkey project <br />* My responsibilities were as follows: <br />** Update 1971 existing ownership line list. <br />** Create a database of [he owner's information <br />** Sent initial letter to landowners and followed up with phone call. <br />** Kept logs of landowner conversations and questions <br />** Met with landowne;rs that wanted a face to face meeting at their property . <br />** Obtained rights of entry for surveyors and environmental consultants <br />** Worked closely with environmental coordinator for access for their surveys <br />** Sent pre-construction notices to landowners along the route <br />** Handled landowner complaints <br />** Supervised 1right-of--way agent <br />Pacific Bell -Petaluma to Napa Fiber-Optic Cable Installatiou project <br />* 40+ mile Fiber-Optic Cable <br />* January, 1991 to October, 1991 <br />Nor-Coast Utility Desil~, [nc.'s turnkey project <br />* My responsibilities were as follows: <br />** Determine landowners involved in the proposed project for easement acquisition & <br />access. <br />** Prepared detailed ownership line list <br />** Create a database of the owner's information <br />** Sent initial letter to landowners and followed up with phone call. <br />** Kept logs of landowner conversations and questions <br />** Met with landowners that wanted a face to face meeting at their property . <br />** Obtained rights of entry for surveyors <br />** Prepared new acquisition easements for re-route alternatives <br />** Obtained all new easements, temporary work space and access easements <br />** Handled landowner complaints <br />Pacific Bell -Santa Rasa to Sebastopol Fiber-Optic Cable Installation project <br />* 12 mile Fiber-Optic Cable <br />* January, 1995 to September, 1995 <br />Nor-Coast Utility Desi@~, Inc.'s turnkey project <br />