My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41988
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:27 PM
Creation date
11/23/2007 11:32:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
General Documents
Doc Date
2/23/2005
Doc Name
Info. Materials
From
Bill Janke
To
San Miguel County
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~-- <br />2. The Ames Hyclro Plant began operation in the late 1800's. At the time, the plant <br />was powered by an open box flume. <br />3. The railroad tracks were abandoned and an embankment was constructed. <br />Technical Revision No. 3 of the Pathfinder Pit Mining Permit states the initial filling <br />occurred in 'iz~nd was done by railroad crews using attack-mounted steam <br />shovel and ~ra~l from the Pathfinder deposit. It is unknown if the trestle was <br />abandoned in-place and fill was placed around the timbers or if the trestle was <br />removed prior to constructing the embankment. <br />4. In 1956, Western Colorado Power, the previous owner of the power plant, replaced <br />the open box flume with a steel penstock. We understand the pipe was buried <br />within the embankment. We understand through PSCO that the embankment was <br />part of a primitive road following the old railroad grade, used for light, occasional <br />traffic by PSCO and previous owners for maintaining the pipeline. <br />5. In 1984, Colorado Ute (another former owner of the power plant and penstock) <br />replaced the steel pipe in a 2,208 foot reach with fiberglass pipe manufactured by <br />Ershigs. <br />6. In 1993, Pathfinder started using the embankment to access a gravel pit. We <br />understand initial traffic was minimal. <br />7. In 1994, grading for the road by Pathfinder caused damage to the fiberglass pipe. <br />The pipe was repaired by a contractor retained by PSCO. The ramp from Colorado <br />145 and 975 feet of access road to the Pathfinder Pit were constructed in 1994. <br />We understand the original embankment was not substantially widened at that <br />time. <br />8. In the Spring of 1997, the repair made following the damage by Pathfinder to the <br />fiberglass pipe failed, which created a washout and resulting earthflow into the <br />valley below the embankment. Repairs were made to the pipe and embankment <br />during 1997. <br />9. During the pipe repairs conducted in 1997, we understand PSCO excavated next <br />to and around the pipe at regular intervals and installed anchors on the uphill <br />(east) side connected to the pipe with straps. The anchors consisted of timber <br />beams buried in the embankment an unknown distance uphill. <br />10. In 1998-99 Pathfinder placed fill along the downhill (west) side of the original <br />embankment, without consulting PSCO. Representatives of PSCO have estimated <br />PUBLIC SERVICE COMPANY OF COLORADO <br />AMES HYDRO PENSTOCK <br />CTL/T 37,8dB Z <br />