<br /> <br />-2- <br />9. WITH RESPECT TO THE EVALUATION OF SPECIES DIVERSITY ON RECLAIMED AREAS, KERR <br />COAL IS REQUIRED TO [JORK WITH TIfIS DIVISION TOWARDS THE ESTABLISHMENT OF <br />MUTUALLY ACCEPTABLE SUCCESS CRITERIA. SUCH CRITERIA SHALL BE FORMULATED <br />AND AGREED TO NO LATER THAN SEPTEMBER 30, 1981. <br />10. GdITH RESPECT TO KERR COAL'S PLAN FOR MITIGATION OF POSSIBLE IMPACTS ON SAGE <br />GROUSE, PRECISE LOCATIONS FOR FERTILIZER APPLICATION h1UST BE SUBMITTED EACH <br />YEAR TO THE MINED LAND RECLAMATION DIVISION FOR APPROVAL, AT LEAST 30 DAYS <br />PRIOR TO THE SCHEDULED FERTILIZATION DATE. SUCH APPROVAL SHALL BE BASED ON <br />A COMPARISON (TO BE PROVIDED BY KERR COAL) OF AREAS TO BE FERTILIZED WITH <br />AREAS TO BE DISTURBED, RELATIVE TO SAGE GROUSE HABITAT TYPES AS SHOWN ON <br />MAP 23. A DISCUSSION OF THESE AREAS WITH RESPECT TO SAGE GROUSE USE AND <br />ACCESSIBILITY TO THE BIRDS MUST ALSO BE PROVIDED. <br />11. KERR COAL IS DIRECTED TO SUBMIT TO THIS DIVISION ON A REGULAR BASIS DATA <br />FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PAGE 816-129 OF <br />THE APPLICATION, TO DETERMINE WHETHER FUTURE OPERATIONAL EXPERIENCE ZS <br />CONSISTENT LdITH THE PROJECTED SWELL FACTOR OF 290. <br />12. NO LATER THAN 90 DAYS PRIOR TO THE SCHEDULED COMMENCEMENT OF OPERATIONS ON <br />THE SECOND BONDING INCREMENT (AS SHOWN ON MAP 4b) KERR COAL h1UST SUBMIT <br />DETAILED WORST CASE RECLAMATION COST ESTIMATES TO THE DIVISION FOR REVIEW. <br />ANY REQUIRED ADDITIONAL BOND AMOUNT MUST BE SUBMITTED AND APPROVED PRIOR TO <br />THE COMMENCEMENT OF OPERATIONS ON THAT INCREMENT. A SIMILAR PROCEDURE SHALL <br />BE FOLLO[dED FOR ANY SUBSEQUENT INCREMENTS. <br />