Laserfiche WebLink
<br /> <br /> <br />'f ~, .. :.. ti,.l' i•m <br />~~'.' i., r' ~ I J~~ <br />'n '~ <br />~n i <br />NI Nl~si_ PF is M j T"--5.9 ~L <br />Permit date __ March 20 _~ 1981_ Permit No. C_006-80___ <br />Permit Expiration i7ate _s~~h~,__, I9g~ <br />THIS PE~tMI7 is issued by the Mined Land Reclamation <br />division, Cepartment of Natural P.esources, State of Colorado. <br />RL_~raLS <br />I. Y.err Coal Compan~_ ("operator") desires to <br />----------- ----------- <br />conduct a mining operation kndwn as MA RR STRIP~MARR PREPARATION PTtPyNT <br />for the purpose of extracting coal. <br />II. L'n __ Ma~~2Q_____, I981_r the ,Mined Land Reclamation <br />~~ivision ("the division".) appreved operator's application <br />For this permit, fixed the amount of bond and directed that <br />this permit be issued Upon the filing with the diviSiCn Cf <br />bond in the amount so fixed in form and substance approved <br />by the division, and such bona has been se furnished. <br />III. Un __r~~~ZQ_____, 1dei,_, the oiv;sicn made the fcl- <br />lOwiny findings: <br />a) The permit application is accurate and contains <br />all information required under C.R.S. 1973, 34-33-L%L ~~ <br />;zgq. and regulations promul,ated thereunder and that all <br />the requirements of article 33 of title 34, C..4.S. L973 <br />("such article") for the issue of a per,nit have been complied <br />with; <br />b) Tne applicant has demonstrated that reclamation <br />as required by such article can be accomplished under the <br />reclamation plan contained in the permit application; <br />c) The assess,nent of the probable cumulative ;mpact <br />of all anticipated mining in the area on the hycroloe,ic bal- <br />ance specified in section 34-33-110(2) (1) has been made ov <br />the division and the proposed operation thereof has been <br />designed to prevent material eam.ace to hydrologic t;alanca <br />outs;de the permit area; <br />d) Granting the permit will not conflict with any <br />desi ynaCiOn deCisiOn issued pursuant CC seCtiOn 522 Of Ch2 <br />federal "iurface t4ining Control and Reclamation oCt of 1977", <br />ds dmCndedr (P.L. 95-37), nor i5 the dreg prOpOSed CO bE <br />mines within an area under study for unsuitability Ces~gna- <br />cion in an administrative proceeding commenced pursuant to <br />section 34-33-126 or section 522 cf said P.L. o5-87. <br />e) (I) Unless the proposed operation was an cper- <br />acion which produced coal in commercial Guant~t~es in the <br />