My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41779
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:07 PM
Creation date
11/23/2007 11:23:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
12/28/1981
Doc Name
Stip. 14 internal review
From
J. Pendleton
To
TOM GILLIS
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~_ :~: • <br />Tom Gillis -2- December 28, 1981 <br />In my_opinion, Exhibit 3.2.9.B satisfies that portion of Stipulation No. 14 <br />which requires a preliminary analysis of the stability of the upper wastepile. <br />The remaining requirements for site-specific, detailed geotechnical analyses <br />and_detailed engineering plans are not satisfied. However, Stipulation No. 14 <br />only requires that these additional requirements be satisfied prior to construc- <br />tion of the pile or the access road to the upper bench. St is important for <br />purposes of future detailed stability analyses that the operator expeditiously <br />insta_I1 an appropriate surface monitoring system, as recorn~n .e y e_o- y~ro <br />Consulting, Inc., prior to the driving of the entries beneath the pile. "' <br />Because the operator is currently installing the mine entries and will commence <br />the development of sub-mains shortly thereafter, our acceptance of Ex-hibit <br />3.2.9.8_should be_,_conditioned upon the operato_r's submission of, our approval <br />.. ... ... <br />of, and the operator's installation of such a surface mon ti oring sy5-tefi:"-`~ <br />On October 27, 1981, the operator amended the permit application to indicate <br />that the Upper Waste Pile would not be constructed during the initial and <br />current five year permit period. <br />/mt <br />cc: Ed Bischoff <br />Dave Shelton <br />
The URL can be used to link to this page
Your browser does not support the video tag.