Laserfiche WebLink
~+ <br />l <br />RECLAMATION COSTSUMMAR7 cont~d <br />sT,eet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />________I______________________________________________________________ <br />n/a <br />Subtota( (H): <br />[. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />n/a <br />________________________________________________________________________ <br />Subtotal (I7: <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No,l Task Description ~ Cost (S) <br />________I__________________________________-,~___~_________I____________ <br />5 ~ place topsoi L/fines u/scraper for dozer ~ 517,974 <br />to spread at finish grade. 50.566/cy <br />4 ~ Finish grade topsoil/fines a b" depth on ~ 514,593 <br />slopes and floor, by dozer. <br />Costs assume all necessary materials are <br />available onsite, with no outside purchase <br />or hauling costs. <br />_________________________ <br />Subtotal (J ): 532,567 <br />