My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41694
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:02 PM
Creation date
11/23/2007 11:20:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
7/19/2002
Doc Name
Construction Permit No. 11ME670-1F (Mod #2 & ToO#2)
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~`',1~ <br />Z ~ .- <br />` '~ 1 .. .. <br />- COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT <br />AIR POLLUTION CONTROL DIVISION <br />TELEPHONE: (303) 692-3150 <br />STATE OF COLORADO <br />oF'~~lp <br />He <br />~O~ <br />~ X876 ~` <br />CONSTRUCTION PERMIT <br />PERMIT NO: 11 ME670-1 F <br />FINAL APPROVAL <br />DATE ISSUED: JOLY 19, 2002 Modfication#2andTransferofOwnership#2 <br />IssuED 70: Snowcap Coal Company, Inc. <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Surtace facilities associated with underground coal mine known as the Cameo Mine located <br />in the NE '/. of Section 28, T10S, R98W, north of highway I-70 at Cameo, Mesa County, <br />Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />The following activities at the Unit Train Loadout Facility (Area 2): <br />Truck hauling of coal <br />Coal stockpiling <br />Rail car loading <br />Radial stacker <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND <br />CONTROL ACT C.R.S. (25-7-101 et se , TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED <br />IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by Regulation <br />No. 1. Section III.D.1.b. <br />2. The Division's approval of the control plan is based on the submitted production level as listed <br />below. Prior to any increase in daily or annual production rates, the applicant shall submit an Air <br />Pollutant Emission Notice and Control Plan revision which will be subject to Division review and <br />approval to ensure compliance with the National Ambient Air Quality Standards for particulate <br />matter. Records of the actual production rate shall be maintained by the applicant and made <br />available to the Division for inspection upon request. (Reference: Regulation 1, III.D.1.b.) <br />Truck hauling of coal shall not exceed 5800 tons per day and 2,000,000 tons per year. <br />Conveying/stacking of coal shall not exceed 25,000 tons per day and 2,000,000 tons per year. <br />Rail car loading of coal shall not exceed 35,000 tons per day and 2,000,000 tons per year. <br />Total coal stockpiles shall not exceed 120,000 tons and 1.26 acres <br />077/0082/001 ver. 2/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.