Laserfiche WebLink
-4- <br />MR14: Move crusher machinery, extend portal mouth conveyor, and install safety <br />bench on N. side of coal stockpile pad. Approved as a field minor <br />revision on 3/31/89. Revised Figure 2.2-2 was submitted to the bivision <br />within the stipulated time frame. These revision items have been <br />implemented by the operator. <br />MR15: Install extensions to the 30" to 42" diameter bypass culvert outlet <br />ends. Submitted 4/20/89, approved 4/26/89. Revised Figures 2.2-2 and <br />2.2-3 were provided in the submittal. The operator has implemented this <br />revision. <br />Technical Revisions <br />TR03: Install office/parking lot facility. Submitted 9/6/88, approved <br />11/4/88. The permit text, figures, and the performance bond amount were <br />revised accordingly. This revision has been implemented by the operator. <br />IV. 57ATUS OF STIPULATIONS <br />Stipulations are listed numerical]y and refer to those present in the <br />April 5, 1988 Mined Land Reclamation Division Proposed Decision and Findings <br />of Compliance for the McClane Canyon Mine permit renewal. Stipulations <br />contained in this document consisted of ongoing stipulations and stipulations <br />that were updated and revised from the April 16, 1985 findings document as <br />part of the permit renewal process. <br />Stipulation-No;-l: Archaeological/cultural resource discovery stipulation <br />Stan ar stipulation). <br />Status: Ongoing <br />Stipulation No: 2: Surface water monitoring requirements, <br />Status: Ongoing <br />Stipulation No 3: Annual hydrology report submittal requirements. <br />Status: Ongoing <br />Stipulation No. 4: Groundwater monitoring requirements. <br />Status: Onaoinp <br />Stipulation No; 6 Topsoil Fertility analysis prior to seeding. <br />Status: Onooina <br />Summary: The status of stipulations attached to the April 5, 1988 permit <br />renewal findings document remains unchanged at the present time. <br />It should be noted that an additional "Stipulation No. 1" was <br />attached to the approval for TR03 to secure additional bond <br />monies. This stipulation was subsequently resolved with the <br />submittal of additional bond coverage. <br />