Laserfiche WebLink
2. WILLIAMS CREEK AND UPPER WARD CREEK <br />a. MONTHLY MEASUREMENTS OF STREAM FLOW. <br />b. MONTHLY MEASUREMENTS OF pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE. <br />3. IRRIGATION DITCN SITES sp-A, sp-C AND sp-D <br />d. WEEKLY FLOW MEASUREMENT FOR THE PERIOD APRIL THROUGH OCTOBER OF <br />EACH YEAR. <br />b. MONTHLY MEASUREMENT OF pH, ELECTRO-CONDUCTIVITY, AND TEMPERATURE. <br />c. QUARTERLY WATER QUALITY ANALYSES FOR PARAMETERS LISTED ON <br />ATTACHMENT B TO THIS DOCUMENT. <br />4. SPRINGS 1, 2, 3, AND 4 <br />MONTHLY MEASUREMENT OF FLOWS FOR THE PERIOD APRIL THROUGH OCTOBER OF <br />EACH YEAR. <br />5. SEDIMENT POND DISCHARGES <br />ALL NPDES RECORDS SUBMITTED TO THE DIVISION QUARTERLY. <br />STIPULATION N0. 8 <br />PRIOR TO EXCEEDING THE 400,000 TON/YEAR PRODUCTION LEVEL, THE PERMITTEE <br />WILL FIRST OBTAIN THE NECESSARY AIR QUALITY PERMIT REVISIONS. <br />Stipulation No. 9 <br />BOND IN THE AMOUNT OF $190,000.00 MUST BE SUBMITTED TO THE DIVISION <br />WITHIN 60 DAYS OF THE INITIAL DATE OF PUBLICATION OF THE DIVISION'S <br />PROPOSED DECISION. THE PERMIT CANNOT BE ISSUED UNTIL THE BOND HAS BEEN <br />SUBMITTED. <br />-5- <br />