My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41476
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:28 PM
Creation date
11/23/2007 11:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987024
IBM Index Class Name
General Documents
Doc Date
3/30/2001
Doc Name
COREY GRAVEL PIT 3 PN M-1987-024 RECLAMATION COST RECALCULATION NOTICE OF BOND INCREASE
From
DMG
To
ROBERT D & LAVELLE COREY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 State :Colorado PermiUjob# : M-1987-024 <br />Dale : 03/27/2001 County ~ Montrose Abbreviation : none <br />User : RCO Sife :Corey Gravel Pif #3 Filename : M024-006 <br />Agency or organization name : DMG <br />Permit or other job action : Bond review <br />Task description : Spread topsoil On highwall <br />HOURLY EQUIPMENT COST <br /> Basic machine . Cat D7R - 7SU Horsepower : 230 <br /> Blade type : Semi-Universal <br /> Attachment no 1 : ROPS Cab Shift basis ~ 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source . (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $43.32 NA <br /> Operating cosUhour : $49.44 100 <br /> Ripper op.cosVhour : $0.00 0 <br /> Operator cosUhour : $27.99 NA <br /> Total unit cosUhour : $120.75 To tal fleet cosVhour : $120.75 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,269 LCY factor : NA volume: 2,269 LCY <br />Source of estimated volume : 2.5 ac x 6" depth (see vo/ task 004) <br />Source of estimated swell factor : n/a <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 714.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shit/day) <br />Loose stockpile Spoil pile : 0.70 ((nd-m() <br /> Push gradient . 1.43 (Cat HB) <br />Average push gradient : 20.00 % (neg) Altitude : 0.95 (Cat HB) <br />Average site altitude : 5,800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 Ibs/LCY Net correction . 0.64 <br />Weight description <br />Earfh -Dry packed Adjusted unit production : 456.29 LCY/hr <br /> Adjusted fleet production : 456.29 LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.97 Hours <br />Unit cost : $0.265 /LCY Total job cost : $600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.