Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task # : 004 State : Coloratlo PermNjob # : M-1987-024 <br />Date : 03272007 County :Montrose Abbreviation :none <br />User : RCO Site :Corey Gravel Pif q,? Filename : M024004 <br />Permit or other joh action :Bond review <br />Task description :Haul topsoil to highwall (or spreading <br />HOURLY EQUIPMENT COST <br />Model : Caf 623E Shdl basis : 1 per day <br /> <br />Cost Breakdown : Jab utilization o Horsepower 365 <br />Ownership cosVhour : $50.47 NA <br />Operating cosUhour: $91.56 700 Weight (UST)' 38.92 <br />Operator cosUhour : $28.18 NA Cost data source : (CRGJ <br />Total unit cosUhour: 4170.22 Total Oeel cosOhour: $170.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,017 CCY laclor: 1.125 volume: 2,269 LCY <br />Source of quantity take-off : 2.5 ac x 6'depth per approved plan <br />Source of estimated swell (actor : Na <br />HOURLY PRODUCTION <br />Haulino CaoaciN <br />Material description <br />Earth -Dry packed <br />Rated payload : 55,200 pounds <br />Payload capacity: 27.65 LCY <br />Struck volume: 1@.00 LCY <br />Heaped volume: 23.00 LCY <br />Average volume : 20.50 LCV <br />Adjusted capacity: 20.50 LCY'-' <br />Cvcle Time (load ~ haul . soread • returnl . Loading time : 0.90 minutes' <br /> Maneuver and spreatling lime : 0.70 mina\es <br />Travel lime : ' tootling time per part on push-pull models <br />Route Distance (feel) ~ Grade (Yo) Rall. res.(%) Total res.(%) ~ Velocity (fpm) ~ Travel lima (min.) <br />Haul: 350 70.0 5.0 15.0 39B 7.02 minutes" <br />Return: 350 -10.0 5.0 -5.0 2,640 0.32 minutes" <br />" Vavel time adjusted rot acceleration and tlecelaraGOn at load antl tlump Points <br /> Total cycle time 2.95 minutes <br />Job Condition Correction Factors <br />Site altitude (leer) <br />Altitude adjustment factor <br />Jab efficiency laclor <br />Net job correction laclor <br />JOB TIME AND COST <br />Fleet size' / Scraper(s) <br />Unit cost: 50.523 /LCY <br />Adiusted Heurlv Production <br />Unadjusted unit production : 477.23 LCY/Hour"` <br />Adjusted unit production : 325.52 LCYIHOUr <br />Adjusted Oeel production : J25.52 LCY/Hour <br />1 umes wlume on push pull motlels <br />Total lob lime: 6.97 Hours <br />Total job cost : $1,187 <br />