COREY GRAVEL PIT 3 PN M-1987-024 RECLAMATION COST RECALCULATION NOTICE OF BOND INCREASE
From
DMG
To
ROBERT D & LAVELLE COREY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl ni NaBir, I Resources <br />1313 SFerm~n 51 ,Room 215 <br />Denver, Colurado 80203 <br />Phone (303) 866-356% <br />FAY: U03) 832-8106 <br />March 28, 2001 <br />Robert D. and Lavelle Corev <br />62237 Spring Creek Road <br />Montrose, CO 81401 <br />-GTE T~ _ <br />111 IIIIIIIIIIIII III <br />AR34? <br />R~C~I~~~ <br />Ory,~On of O~~ <br />Minare/s aodCe°1 <br />°er <br />~'coLOr~o <br />v~°`~9~~ ~~=~'a~~ <br />~'~d~l~d~ ~'~~~ ~~~~ <br />it °° M-14S~--yz4 <br />~B`~~o ~r~ Pry- ~k3 <br />D I V I S I O N O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SA FE7Y <br />Bill Owen, <br />Governor <br />Gres E. Walther <br />Execuhve Dueaar <br />hfichael B. Long. <br />Divmion Dir+clor <br />Re: Corey Gravel Pit #3, Permit No. M-1937-024, Reclamation Cost Recalculation, Notice of Bond Increase. <br />Dear Mr. and Mrs. Corey, <br />f have recalculated the reclamation casts for the above-named site, based on the current condition of the site and the <br />approved mining and reclamation plans. As you know, the bond amount of each permit must be reviewed <br />periodically. The State statutes require that if an existing bond amount is insufficient, the operator must provide the <br />additional bond within 60 davs of notification. Your existing bond amount is $x,000.00. The enclosed reclamation <br />cost estimate amounts to $ 18,670.00, which indicates an increase of $13,670.00 in the repaired bond. You are <br />hereby notified of such increase <br />Please review the figures in the enclosed reclamation cost estimate packet. The packet consists of a one-page <br />summary sheet followed by detailed individual task sheets and equipment production sheets. The figures in the <br />packet account for the reclamation according to the approved plan in the file, in the amounts needed presently, <br />based on observations made during the last inspection, <br />These are preliminary cost figures, and it is reasonable to expect that you or your agent may contact me to discuss <br />revisions to them. However, this total bond amount will become effective, unless you provide better information. <br />have included notes on the sheets in the packet to explain the basis of quantities, grades and distances used in the <br />estimate. Details such as final gradients, topsoil replaced, and seed mix were taken from the approved plan in the <br />file. Please be reminded that the State recognizes that operators routinely perform their required reclamation for a <br />lesser cost than their bond amounts. However, eve must base our bond calculations on the equipment costs and <br />labor rotes which are charged to the State by reclamation contractors. <br />Please review this packet and contact me nronrotly if you notice any errors or more efficient methods of oerformin <br />the reL~ired reclamation. Resuonses from you or your anent, concerning modification of amp estimated reclamation <br />cost. should be in writing. Please be aware, however, of the 60-dav timeframe for providing the bond increase. By <br />State starine. I cannot extend this Deriod. but revisions to [he figures in this estimate may be made. ODera[ions with <br />insufficient bonds may be found in violation. The 60-day period begins on the mailing date of this letter, March 28 <br />2001, and expires on May Z9, 2001. <br />PLEASE DO NOT DISREGARD THIS LETTER. IF NO BOND INCREASE IS SUBMITTED DURING THE <br />NEXT 60 DAYS, THIS MAY BECOME A POSSIBLE VIOLATION. <br />Pertbming any of the tasks associated with final reclamation will act to reduce your total bond required. I <br />recommend that the reclamation plan details be reviewed prior to commencing reclamation, to ensure [hat the job is <br />performed to specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.