My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41456
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:24 PM
Creation date
11/23/2007 11:11:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977302
IBM Index Class Name
General Documents
Doc Date
3/12/1993
Doc Name
AERIAL PHOTOGRAPHS PN M-77-302
From
DMG
To
PETE LIEN & SONS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iiiiiiiiuiniiiiii <br />sss <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />pF' p0~ <br />Depa rimenf of Narural Resources ~¢ _ a <br />G~ . <br />171 3 Shc: mau SL, Room 215 ~ • ~h~ <br />L'enver. CO 50203 tx.~ <br />r <br />r'hone: 1303 8h8-3561 • eac • <br />FA%:1303183'_-8106 <br />Rov Romer <br />Governor <br />March 12, 1993 ,~~~naeie.~ong <br />Dinsion Director <br />Mr. Randy Banning <br />Pete Lien and Sons, Inc. <br />P.O. Box 440 <br />Rapid City, SD 57709 <br />Re: Aerial Photographs - Permit No. M-77-302 <br />Dear Mr. Banning: <br />Aerial photographs of the Owl Canyon Quarry were taken by the Division on <br />March 2, 1993 to verify permit compliance for your operation. Our goal is to <br />ensure that all mine operators are operating within their permitted areas and <br />that all disturbed areas are adequately bonded for reclamation. Enclosed are <br />the photographs taken on March 2, 1993. <br />Please review the photographs and indicate to us whether your operation has <br />been properly photographed. If so, use a red marker to highlight the <br />permitted area, and if appropriate, phases of the operation which are <br />currently bonded. In addition, we request your cooperation in determining the <br />number of acres currently disturbed, the number of acres currently bonded, and <br />the number of acres released from reclamation responsibility by the Di~2ision. <br />We apologize for the delay in sending the photos to you. However, your <br />cooperation in this matter is greatly appreciated. Following your response, <br />we will either mail a final inspection report to your office or we wi ll <br />conduct a follow-up field inspection, if necessary. <br />Please contact me at 866-3567 if you are unable to respond within 30 d~lys. <br />Sincerely, <br />X Thomas A. Schreiner <br />Reclamation Specialist <br />TASlern <br />Enclosures - Photos <br />cc: Jim Stevens, Senior Reclamation Specialist, DMG <br />Carl Mount, Senior Reclamation Specialist, DMG <br />6676E <br />
The URL can be used to link to this page
Your browser does not support the video tag.