Laserfiche WebLink
~ III IIIIIIIIIIIII III` ~ <br />CONTRACTORS <br />ENGINEERS 999 <br />DEVELOPERS <br />~MORRISON-KNUDSEN COMPANY, INC. <br />E%EGUTIVE OFFICE <br />MORRISON~KNUDSEN PLAZA <br />P0. BO%]800/BOISE, IDAHOU S.A. 83)29 <br />PHONE (208386` /TELE% 368x39 <br />March 15, 1988 <br />Pfr. Fred R. Hants <br />Director <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Subject: Hayden Gulch Mine, C-80-003 <br />Change of Responsibility <br />Dear Mr. Banta: <br />~~ <br />_.. t <br />GiAR 1 g i9o8 <br />I~rfv~n ~a~n <br />~ECLA4/rA'r"i~P.i ~7t~/IS!Crr <br />Effective March 15, 1988, Yampa Mining Company and Morrison-Knudsen <br />Company, Inc., are no longer responsible for any operat.tons at the Hayden <br />Gulch Mine. The contract for mining services between H-G Coal Company <br />(permittee) and Yampa Mining Company (contract operator) has been legally <br />terminated and H-G Coal Company has assumed all re sponsibilitiea. <br />Future correspondence and phone conversations regarding the mine should be <br />directed to: <br />Bich G. Atkinson <br />H-G Coal Company <br />5731 State Highway 1113 <br />Meeker, CO 81641 <br />(303) 824-4451 <br />During the past three years, I have enjoyed working with Dan Mathews, <br />Cathy Begej, and Karen Hellner of the Division. Their cooperation has <br />been appreciated. <br />Si rely, <br />~ia ~ ~~aZ-i~~ <br />Gloria D. Beattie <br />Design Engineer Specialist <br />Mining Division <br />cc: Karen A. Hellner, MLBD <br />Rich G. Atkinson, H-G Coal Company <br />Fred J. Scheaffer, M-K <br />David 0. Snyder, M-K <br />3945h/cm <br />