My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41365
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:08:58 PM
Creation date
11/23/2007 11:09:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977311
IBM Index Class Name
General Documents
Doc Date
11/6/1998
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of orado Division of Minerals and Geology <br />ESTIMATING FORM - BULLD02ER NORK <br />Task #: 4 Prep. by: RCO Task File Name: M311-4 <br />Date: 11/03/98 Permit #:M-77-311 Mine: Sr-13A Mine <br />Permit Action: Final Reclamation <br />Task Description: Close vent shafts <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: Cat D7H SERIES 11 Horsepower: 215 <br />Blade Type: SEMI-UNIVERSAL ---------~ <br />Attachment #1: ROPS cab Shift Basis: 1/day <br />Attachment #2: 3-shank ripper ---------~ <br />Cost Breakdown: <br />-------------- Utilization X <br />Ounersh ip cost/hr = 536.36 N/A <br />Operating 8 overhaul cost/h r- dozer = 540.57 100 <br />-ripper = 50.00 0 <br />Operator cost/hr = 523.12 N/A <br />Total egpt. unit cost/hr = 5100.04 Total fleet cost/hr: 5100.04 <br />MATERIAL QUANTITIES <br />Initial Ewell Loose <br />Volume: 220.0 CCY Factor: 1.125 Volume: 247.5 LCY <br />Source of quantity take-off: Permit reclamation plan <br />Source of est. swell factor: program <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: 100 ft. ------------------------- ------- <br />--------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br />dozer production: 565 LCY/hr Dozing method..... 0.90 (user) <br />--------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Compacted fill or embankment Spoil pile factor. 0.60 (fnd-sf) <br />----------------------------- -------- Push gradient..... 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 X (pos) Altitude derati on. 1.00 (Cat tbl) <br />--------- Material weight... 1.00 (Cat tbl) <br />Avg. site altitude: 5500 ft. Blade type........ 1.00 (S or U) <br />Material weight 2300.00 lb/LCY Net Job Correction 0.30 <br />Mat. Desc r.: --------- --- -------- <br />GENERAL FILL Adjusted Unit Prod.: 170.72 LCY/hr <br />_____________________________ ________ -__ <br />Adjusted Fleet Production: --_-_-__ <br />170.72 <br />LCY/hr <br />JOB COST --- -------- <br />Flee[ size 1 Dozers) Total Job Time: <br />--- 1.45 Hours <br />________ <br />Unit Cost 50.586 <br />/LCY <br />Total Job Cost: -------- <br />5145.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.