My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41349
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:08:54 PM
Creation date
11/23/2007 11:09:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
General Documents
Doc Date
6/7/2001
Doc Name
FAX of Pertinent Section of Regs
From
DMG
To
HOLNIM INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 60 <br />Construction Materials Rule 3 <br />otherwise approved by the Board or Office, shall be no steeper than a ratio of 2:1 <br />(horizontal to vertical ratio), except from 5 feet above to 10 fee[ below the expected <br />water line where slopes shall be not steeper than 3:1. Tf a swimming area is proposed <br />as a portion of the Reclamation Plan, the slope, unless otherwise approved by the <br />Board or Office, shall be no steeper than ~: ] throughout the area proposed for <br />swimming, and a slope no steeper than 2:1 elsewhere in the pond. <br />it6(a)to) (8) If the Operator's choice of reclamation is for agricultural or <br />horticultural crops which normally require the use of farm equipment, the Operator <br />shall grade so that the area can be traversed with farm machinery. <br />(9) An Operator may backfill structural fill material generated ;a chin the <br />MLRB pemritted area into an excavated pit within the permit azea as provided for in <br />the MLRB Permit If an Operator intends to backfill inert structural fill ~enerated~ <br />outside of the approved permit area, i[ is the Operator's responsibility to provide the <br />~ Office notice of any proposed backfill activity not identifies: in the approved <br />Reclamation Plan. If the Office does not respond to the Operator's notice within <br />thirty (30) days after receipt of such Notice by the Office, the Operator may proceec: <br />in accordance with the provisions of this Rule. The Operator shall maintain a <br />Financial Warranty at all times adequate to cover the cost to stabilize and cover any <br />exposed backfilled material. The Notice to the Office shall include but is not limited <br />to: <br />(a) a narrative that describes the approximate location of the <br />proposed activity; <br />(b) the approximate volume of inert material tr• oackfilled; <br />(c) a signed affidavit certifying that the material is clean and inert, <br />as defined in Rule 1.1(20); <br />(d) the approximate dates the proposed activity will commence <br />and end, however, such dates shall not be an enforceable condition; <br />(e) an explanation of how the backfilled site will result in a post- <br />miningconfiguration that is compatible with the approved post-mining land <br />' I, use; and / <br />W 1V <br />
The URL can be used to link to this page
Your browser does not support the video tag.