PERIODIC STATEMENT FOR PARTWL PAYMENT N0. 3 Sheet No. 1
<br />PROJECT: Hawks Nest Coal Silo Demolition Reclamation
<br />FOR THE PERIOD 5/15/94 TO 6/15/94 ,INCLUSIVE
<br />OWNER: State of Colorado, Division of Minerals 3 Geology
<br />CONTRACTOR: Miners Inc.
<br />9137 E. Mineral Circle, Suite 160
<br />Englewood, Colorado 80112
<br />STATEMENT OF WORK Wr1RK PF RFr1RMFf1
<br />Item Description Contract Previous This Estimate Total to Date
<br /> Unit $ Unit S Unit f Unit f
<br />1.0 MobilizationJDemobilizatbn L.S. 442,248 100% 442,248 0% 40 100% 842,248
<br />2.0 Structural Demoltion & Disposal
<br />a. Structural Demolition
<br /> Demo Headhouse L.S. 519,250 100% 519,250 0% SO 100% 819,250
<br /> Demo Conveyor L.S. 445.000 ~ 100% 545,000 0°i5 50 100% 445,000
<br /> Drill & Blasi Sib #1 L.S. 446,550 100% 546,550 0% $0 100% 546,550
<br /> Drill & Blast Silo #2 L.S. 546,550 100% $46,550 0% 40 100% $46.550
<br /> Demo Truck Dump & Scale L.S. 514,546 100% 514,546 0% f0 100% $74,546
<br /> Sub-Total $171,896 5771,896 EO $171,896
<br />b. Disposal/Borrow Area
<br /> Excavate Falling Pit L.S. 427,120 t00% 527,120 0% $0 100% 427.120
<br /> Demo & Bury Silos L.S. 538,550 700% 538,550 0% 40 100% 438,550
<br /> Finish Grade Site L.S. 54,500 100% $4,500 0% f0 100% 54,500
<br /> Repair Road L.S. $3,500 0% f0 700% 43,500 100% $3,500
<br /> Sub-Total $73,670 570,170 53,500 573,670
<br />3.0 Additional Dozer Hours 3.5 Hrs. $805 0% $0 0% 50 0% SO
<br />'4.0 Denver Rio Grande Flagmen 23 Hrs. 41,050 0% SO 0% 50 0% 50
<br />5.0 Change Order #1 (Seasonal Conditions) L.S. 53,735 10095 53,735 0% 40 100% 53,735
<br />'6.0 Change0rder#2 L.S. 53,450 0% $0 100% f3,450 100% $3,450
<br />Total Work ttems 5296,854 $288,049 56,950 $294,999
<br />Material on Hand - 40 50 $0
<br />,,~ Total $296,854 $288,049 $6.950 $294,999
<br />~ 'Items revised
<br />per Change Order #2