My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41307
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:08:44 PM
Creation date
11/23/2007 11:08:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
1/17/1983
Doc Name
ROADSIDE REFUSE PILE FIELD TRIALS FN C-81-041
From
MLRD
To
POWDERHORN COAL CO
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,., ..~. <br />,. <br />Henry Barbe -2- January 17, 1983 <br />- 4) A wider range of soil depths should be tested on the research plots. <br />The Division suggests depths of 6, 12, and 24 inches. From this data, <br />the cove.' and productivity for 18 inches of topsoil can be inferred. <br />5) Powderhorn has proposed no statistical comparison between test plot <br />data and the revegetation success standards. With the proposed design, <br />there is no way to evaluate whether a given depth of topsoil is adequate . <br />when compared to the natural community. <br />6) 1t should be noted that if phosphorus is deficient, this fertilizer <br />must be incorporated into the topsoil prior to seeding. <br />7) Seeding at Powderhorn in September may be too early. Seeding during the <br />last week in October or first week in November would be preferable. <br />8) Please clarify why the field trials plots are to be mulched at 1.5 tons/ <br />acre and the rest of the refuse pile at 1.0. For purposes of controlling <br />soil moisture loss, 1.5 tons/acre is optional. <br />A meeting may be in order to discuss the above comments. Hopefully, we <br />can reach a tentative agreement during my next inspection at Roadside and <br />Cameo. <br />As always, please call if you have any questions. <br />incerely, <br />~.lin Herron <br />Re lamation Specialist <br />JH/mab <br />
The URL can be used to link to this page
Your browser does not support the video tag.