Laserfiche WebLink
-5- <br />COLLETED BY APPROPRIATELY QUALIFIED PROFESSIONAL GEOLOGICAL OR <br />ENGINEERING PERSONNEL. THE PURPOSE OF THIS FINAL INVESTIGATION SHALL <br />BE TO VERIFY, OR APPROPRIATELY AMEND, THE FINDINGS OF THE <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE ROADWP.Y CORRIDOR. <br />FURTHER, WEST ELK SAL COLANY, UTILIZING THE FINDINGS OF THE FINAL <br />GEOTECHNICAL INVESTIGATION, SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE <br />AND DRAINAGE DESIGN FOR THE UPPER WASTE PILE ACCESS ROAD. THIS FINAL <br />DESIGN SHALL BE APPROVED BY THE DIVISION, IN WRITING, AND THE <br />CONSTRUCTION COLLETED IN ACCORDANCE WITH THAT DESIGN, PRIOR `IO THE <br />TRANSPORTATION OF ANY WASTE MATERIAL ALONG THAT ACCESS ROAD. <br />Stipulation No. 17 ,~ <br />~ ~~ WECC MUST SUBMIT ADDITIONAL BOND, IN THE AMOUNTS DESCRIBED IN THE LOWER <br />WASTE PILE PERMIT REVISION APPLICATION, AT LEAST THIRTY (30) DAYS PRIOR <br />TO THE CONAIENCEMENT OF CONSTRUCTION OF PHASES III, IV, and V OF THE <br />LpWER WASTE PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED <br />BY THE DIVISION PRIORR TO CONSTRUCTION FOR THESE PHASES. <br />~9tipulation No. 18 <br />,~ ~7- <br />THE DIVISION DIRECTS WECC TO COLLETS THE INSTALLATION OF THE <br />SUBSIDENCE MONITORING NETWORK PRIOR TO THE INITIATION OF EXTRACTION OF <br />COAL WITHIN THE PANEL DESIGNATED IN APPENDIX A TO THE NGVEhIBER, 1984 <br />PERMIT REVISION APPLICATION ENTITLED "APPLICATION TO REVISE THE hIINING <br />AND RECLAMATION PLAN FOR THE h1T. GUNNISON NO. 1 UNDERGF3~UND MINE". <br />THIS MONITORING NETWORK IS DESIGNED TO MONITOR THE FIRST PANEL WEST <br />FROM THE SW MAINS INTAKES AND SOUTH OF THE N0. 1 WEST SUBMAINS, <br />DESIGNATED AS "PANEL 1W-15", LOCATED AAIACENT TO AND PARALLEL TO THE <br />WESTERN BOUNDARY OF SECTION 21, RANGE 90W, TGWNSHIP 135. THIS <br />MONITORING NETWORK SHALL CONSIST OF SUBSTANTIAL MONUMENTS DESIGNED TO <br />RESIST FROST-HEAVE, F/IRE, AND THE ACTIONS OF CATTLE AND WILDLIFE. <br />Stipulation No. 19 J <br />~ ~~ THE SUBSIDENCE MONITORING NETWORK SHALL BE SURVEYED UTILIZING <br />CONVENTIONAL GROUND SURVEYING TECHNIQUES, DESIGNED TO ACHIEVE <br />HORIZONTAL ACCURACIES COMPLYING WITH THE U.S. DEPARTMENT OF CONA7ERCE'S <br />"SECOND ORDER, CLASS II" SURVEY STANDARDS, AND VERTICAL ACCURACIES NO <br />LESS THAN + 0.2 FEET. THIS GRID SHALL BE SURVEYED 'TWICE PRIOR ZO THE <br />INITIATION OF SUBSIDENCE. IN CONJUNCTION WITH THESE SURVEYS WECC SHALL <br />SELECT AND ESTABLISH A MINIMUM OF SIX TRIANGULATION BENCH MARK <br />MONUMENTS OUTSIDE THE AREA OF ANTICIPATED SUBSIDENCE EFFECTS, FOR THE <br />PURPOSE OF CORRELATION WITH AERIAL PH(yIOGRAhM4ETRIC POST-SUBSIDENCE <br />SURVEYS. <br />~ipulation No. 20 ,~ <br />~ ~~ <br />WECC HAS REQUESTED PERMISSION TO COLLETS A PRE-SUBSIDENCE AERIAL <br />PHO'IOGRANIME'1'RIC SURVEY OF THE SUBSIDENCE MONITNRING GRID, FOR THE <br />PURPOSE OF CORRELATION WITH THE FIELD SURVEY RESULTS. IT IS WECC'S <br />INTENTION TO UTILIZE AERL4I, PHOTOGR~TFIC METHODOLOGY TO MONITOR <br />POST-SUBSIDENCE MCJVFMENTS OF THE SUBSIDENCE MON[A~PTS. THE RESULTS OF <br />