Laserfiche WebLink
i <br />13. 'the owners were made aware of <br />the status of Chi permit review. 2-22-82 <br />14. Draft Small Operators Assistance Program (SOAP) <br />received. 4-28-82 <br />15. Fina] SOAP report submitted. 6-1-82 I <br />I <br />1(~. Pteetings were held i.~ith owners of Viking Coa] Mav, June, <br />Company. ^nd July <br />17. Final submittal of the permit application. 7-28-82 <br />Throughout the permitting process Che applicant has been Viking Coal Company. <br />Initially, the operator, Thyssen Mining and Construction, was the contact <br />for permitting purposes. After the contract between Thyssen Mining and <br />the Viking Coal Company was terminated, on January 27, 1982, permitting <br />i <br />responsibilities were transferred to the owners. <br />Eecause of the lack of adequate baseline information on the entire proposed <br />area [o be permitted, the owners of Viking Coa] Company have resubmitted <br />the permit application. The resubmitted application will be for a five <br />year permit term and covers a much smaller area than the ori6inal permit <br />application. <br />