Laserfiche WebLink
Stipulation No. 28 <br />WEST ELK COAL COMPANY OR ANY SUCCEEDING OPERATOR OF THE MT. GUNNISON <br />NUMBER 1 MINE, MUST CONTINUE TO SUBMIT TO THE DIVISION, AN ANNUAL <br />HYDROLOGIC REPORT. THIS RE PO R7 SHALL INCLUDE AN ANALYSIS OF ALL <br />HYDROLOGIC DATA GATHERED DURING THE YEAR, AN ASSESSMENT OF THE IMPACTS OF <br />MINING DURING THE YEAR, AND AIJ ESTIMATE OF THE PROJECT IMPACTS OF MINING <br />IN THE FOLLOWING YEARS. THIS REPORT SHALL ASSESS THE IMPACTS OF MINING <br />ON THE QUALITY AND QUANTITY OF WATER IN SURFACE STREAI4S, SPRINGS, GROUND <br />WATER AQUIFERS, MINE INFLOW AND MINE DISCHARGE. <br />Status: Active. <br />Stipulation No. 29 <br />WITHIN NINETY (90) DAYS OF APPROVAL OF THE LOWER WASTE PILE PERMIT <br />REVISION, WECC SHALL SUBMIT A REVISED WATER MONITORING PLAN THAT INCLUDES <br />MONITORING OF THE WASTE PILE. THE PLAN SHALL INCLUDE DIRECT SAMPLING OF <br />THE SEDIMENT POND AND UNDERDRAINS DISCHARGE TWICE PER YEAR DURING THE <br />SECOND AND THIRD QUARTER OF THE YEAR. THE PARAMETERS SHALL BE THE FULL <br />LIST OF CHEMICAL CONSTITUENTS, AT LEAST FOR THE THE FIRST YEAR. WECC MAY <br />REQUEST AN ADJUSTMENT OF THE MONITORItJu REQUIREMENTS AFTER THE FIRST YEAR <br />DEPENDING ON THE RESULTS OF THE MONITORING. <br />Status: Complied With. <br />Stipulation No. 30 <br />WECC MUST SUBMIT ADDITIONAL BOND, IN THE AMOUNTS DESCRIBED IN THE LOWER <br />WASTE PILE PERMIT REVISION APPLICATION, AT LEAST THIRTY (30) DAYS PRIOR <br />TO THE COMMENCEMENT OF CONSTRUCTION OF PHASES IV, AND V OF THE LOWER <br />WASTE PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED BY THE <br />DIVISION PRIOR TO CONSTRUCTION FOR THESE PHASES. <br />Status: Future. <br />Stipulation No. 31 <br />WECC SHALL FORWARD FIVE (5) COPIES OF THE COLORADO DEPARTMENT OF HIGHWAYS <br />WRITTEN APPROVAL FOR ACTIVITIES WITHIN 100 FEET Or" THE OUTSIDE <br />RIGHT-OF-WAY. OF COLORADO HIGHWAY 133 WITHIN THIRTY (30) DAYS OF APPROVAL <br />OF THE PERMIT REVISION APPLICATION. <br />Status: Complied With. <br />Stipulation No. 32 <br />THE APPLICANT SHALL MONITOR THE 2 MONITORING WELLS LOCATED OVER THE FIRST <br />PANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE APPLICANT <br />SHALL SUBMIT TO THE REGULATORY AUTHORITY GROUND WATER LEVEL DATA AND <br />WATER QUALITY DATA PRIOR TO MINING THIS PANEL. <br />Status: Future. <br />