Laserfiche WebLink
Stipulation No. 18 (Originally Number 21 from TR 2) <br />THE DIVISION DIRECTS WECC TO COMPLETE A DETAILED ANALYSIS OF THE <br />POTENTIAL EFFECTS UPON THE SLOPE STABILITY OF THE LANDSLIDE DEPOSITS <br />ADJOINING BEAVER RESERVOIR. WECC SHALL INSTALL AND MONITOR AN <br />APPROPRIATE SET OF MONUMENTS ON THE LANDSLIDE DEPOSITS IN ORDER TO <br />OBSERVE THE POTENTIAL DISPLACEMENT OF THE LAND FORM. THE DETAILED <br />ANALYSIS SHALL BE COMPLETED AIJD SUBMITTED TO THE DIVISION FOR REVIEW, <br />PRIOR TO REQUEST FOR APPROVAL TO EXTRACT COAL BENEATH THE LANDSLIDE <br />DEPOSITS ADJOINING BEAVER RESERVOIR. <br />Status: Future. <br />Stipulation No. 19 (Originally Number 22 from TR 5) <br />THE DIVISION DIRECTS WECC AS A PORTION OF ITS SUBSEQUENT PERMIT <br />APPLICATIONS FOR THE MINE, TO SUBMIT REVISED SUBSIDENCE EVALUATIONS. THE <br />SUBSIDENCE EVALUATION FOR EACH PERMIT PERIOD REQUESTED SHALL INCORPORATE <br />THE RESULTS OF SUBSIDENCE MONITORING AND THE LANDSLIDE STABILITY STUDIES <br />COMPLETED TO DATE, AS STIPULATED ABOVE. PARTICULAR ATTENTION SHALL BE <br />FOCUSED UPON DESIGNATED SAFE AREA BUFFERS, TO 8E OBSERVED IN FUTURE <br />MINING BENEATH CRITICAL AREAS, INCLUDING THE DRY FORK OF MINNESOTA CREEK, <br />AND BEAVER RESERVOIR AND THE LANDSLIDE DEPOSITS ADJOINING IT. THE <br />AMENDED SUBSIDENCE EVALUATIONS SHALL INCLUDE THE PROPOSAL OF APPROPRIATE <br />SUBSIDENCE MONITORINu NETWORKS WITHIN EACH OF THESE DESIGNATED CRITICAL <br />AREAS. <br />Status: Future. <br />Stipulation No. 20 <br />THE DIVISION DIRECTS WECC TO LIMIT EXTRACTION WITHIN THE DEFINED <br />"CRITICAL AREA BUFFER ZONES" BENEATH THE DRY FORK OF MINNESOTA CREEK AND <br />LICK CREEK, AS DEPICTED ON EXHIBIT 3.4.4.B.1, TO NO MORE THAN THIRTY (30) <br />PERCEIJT OF THE IN-PLACE COAL. <br />Status: Terminated. <br />ulation No. 21 <br />THE APPLICANT MUST INSTALL MONITORING WELLS IN, CONDUCT PUMPING TEST ON, <br />AND MONITOR WATER LEVELS AND WATER QUALITY IN THE ALLUVIUM OF DRY FORK, <br />LICK CREEK, SOUTH PRONG AND HORSE CREEK ONE YEAR PRIOR TO MINING WITHIN <br />THE WATERSHEDS OF THESE STREAMS. THE APPLICANT SHALL SUBMIT TO THE <br />DIVISION THE DATA AND RESULTS OF THESE TESTS AND MONITORING ALONG WITH <br />PROJECTED IMPACTS PRIOR TO CONDUCTING MINING IJITHIN ANY OF THE WATERSHEDS. <br />Status: Future. <br />