Laserfiche WebLink
Technical Revisions <br />Technical Revision No. 1: Power line, minor light use road relocation, and <br />ventilation fan in Sylvester Gulch <br />Action: Approved With Stipulations, 1/30/85 <br />Technical Revision No. 2: 320 acre assignment to Bear Coal <br />Action: Approved 2/10/86 with Stipulation 18 <br />Technical Revision No. 5: Expansion of temporary gob storage stockpile <br />Action: Approved 10/31/85 with Stipulation 19 <br />Technical Revision No. 8: Discontinue monitoring of two wells located below <br />initial waste rock pile which has been removed. <br />Action: Approved 11/05/85 <br />Technical Revision No. 51: Installation of dewatering device for P16-1 & 2 <br />Action: Approved 8/28/86 <br />Technical Revision No. 52: Installation of dewatering device and relocation <br />of emergency spillway for sediment pond MB-5, <br />Bear No. 1 portal area. <br />Action: Approved 8/29/86 <br />Technical Revision No. 53: Refuse pile cover variance <br />Action: Approved 7/17/87 <br />Technical Revision No. 54: Reduction of hydrology monitoring <br />Action: Approved 7/17/87 <br />Permit Revisions <br />Permit Revision No. 1: 1630 acre addition <br />Action: Approved 8/26/85 with stipulations <br />Permit Revision No. 2: Upper Waste Pile <br />Action: Approved 6/14/85 with stipulations <br />Permit Revision No. 3: Permanent lower waste pile <br />Action: Approved 4/11/86 with stipulations <br />Permit Revision No. 4: Addition of 320 acres <br />Action: Approved 6/14/85 with stipulations <br />