Laserfiche WebLink
a' '' <br />Reporting Period July l2, 1997 -July 20, 1997, <br />Data Collection <br />3 <br />Monitoring data for the new inclinometer (I-11) installed at the toe of the failed fill slope is <br />attached. Surface survey data for the substation cut slope and failed fill sight lines is attached. <br />Field investigation reports on the slope failures from Barr Engineering and Golder Associates are <br />attached. A second inclinometer within the failed fill area will be installed on July 21. Survey and <br />inclinometer data collection will continue. <br />If you have any questions or concerns, please feel free to contact me at (970) 929-2207. <br />Sincerely, <br />~~~. <br />Eric W. Mende <br />E-Seam Project Civil Engineer <br />EWM/mer <br />Attachments <br />xc. Christine Johnston -MCC <br />Phil Schmidt -MCC <br />Gunnison County <br />File <br />