Laserfiche WebLink
Jones Construch'on Services, Inc. <br />P.O. BOX 808, HO7Y,~YSISS CO 81419 <br />(303)871-3114 <br />September 22, 1995 <br />Mr. Norm Every <br />Mountain Coal Co. -West Eik Mme <br />P.O. Box 591 <br />Somerset CO 81434 <br />Re: Mautz Cabin <br />Dear Mr.Evcry: <br />Please fmd the summary of the work Jones Construction Services, Inc. performed, as you requested, on the <br />above referenced cabin, listed below: <br />Jones Construction Services, Inc. started work on the cabin the morning of September 11, 1995. On this <br />day, we Oiled the gaps between the footer and the floor slab with vinyl concrete patching. The patchurg <br />material was leveled off at the top of the expansion joint, rather than even with the floor, so it would not <br />negate the purpose of the expansion joint by coveting over it. This was done in the Living room, Kitchen, <br />NE Bedroom, North Bathroom and the SE Bedroom. <br />On September 12, 1995, we patched the gap between the concrete slab on the East side of the cabin and the <br />footer with dri-mix concrete. We also re-taped the drywaIl in the South bedroom (SE comer, SW comer, <br />under the window and the comer between the ceiling and the East wad), the SE bedroom (SW corner, NE <br />comer, and the flat joints a 8' high on both the cast wall and the north wally the North Bedroom (NE <br />comer) and dte NE bedroom (SE corner and the flat joint at 8' high on the east wall). We patched the <br />existing taping in kitchen, at the cc$ing of the east wall, by the sink and in the living room aI the cer7tng of <br />the west wa1L The patching and re-taped joints received two coats; the tape coat and the 511 coat. We <br />removed, cut off and rc-installed the exterior door in the NE Bedroom, adding a new threshold under the <br />door (this door is severely water damaged and is falling apart). We removed the old toilet and leveled the <br />footer to match the floor level with vinyl concrete patch. <br />On September 13, 1995, we painted the patched azeas of the dtywaIl in the Kitchen, Living Room, North <br />Bedroom, and the South Bedroom with one color and the NE Bedroom and the SE Bedroom m another <br />color. We installed toIlet in the north bathroom, including a new wax ring and tor7et seat. We adjusted the <br />atterior door jambs to allow the doors to operate correctly. None of the doors needed to be removed or cut <br />off. We only had to take a Dt4 and a hammy and tap the jambs slighry to allow the door to operate, with <br />the exception of the SE Bedroom door, it had to be shimmed at the bottom The doors on the South <br />Bedroom the North Bedroom and the South Bathroom didn't need adjusting. <br />This completed the work we were requested to do at this time. If you have other questions or don't full <br />understand the summary, please call us. <br />