My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40963
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:00:04 PM
Creation date
11/23/2007 10:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
9/1/2004
Doc Name
Reclamation & Permit Compliance Status
From
DMG
To
Peabody Energy
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seneca II Mine, Permit No. C-1980-005, Permittine and Inspection Issues <br />TR-36 <br />6/14/04 Application submitted (addressed several issues identified in <br /> September 2003 inspection) <br /> • changes/updates to select postmine (PM) channel designs: PM- <br /> 1, PM-6, PM-9, PM-12, PM-15, PM-17, PM-18, and PM-22 <br /> • hydrologic monitoring plan changes <br /> • Petroleum Contaminated Material stockpile location change <br />6/17/04 Application deemed complete <br />8/2/04 DMG Preliminary adequacy letter sent <br /> • Problems noted with resubmitted SEDCAD designs <br />8/30/04 SCC decision extension request <br />10/18/04 Decision deadline extended from 8/16/04 <br />This technical revision was requested following an inspection of all post mine drainage <br />channels conducted in September 2003. During the September 2003 inspection, erosion <br />was observed in many of the channels. Channels were either not constructed according to <br />the approved plans or SCC had design considerations or changes that would improve <br />select channels. Additionally, some channels were not constructed. During the last <br />complete inspection on July 20-21, 2004 the status of each channel was reevaluated as <br />detailed in the inspection report. <br />2004 Permit Midterm review <br />8/17/04 Midterm permit review conducted -Issues <br />• Permanent road retention <br />• Erosion control and postmine drainage <br />• Solid waste disposal <br />Reclamation of the facilities area <br />• Revegetation success standards <br />• Noxious weed management plan <br />Seneca II Inspection issues - <br />Postmine drainage designs and density have been an ongoing issue at the Seneca II Mine. <br />Areas of erosion and instability in graded channel sections have been identified in <br />numerous inspection reports and continue to be problematic. <br />Post Mine Drainage Channel PM-6 above Stock Pond T29 requires maintenance and <br />repair. <br />PM-4 requires erosion repair and additional riprap protection particularly at the head of <br />the channel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.