Laserfiche WebLink
<br />9. WITA RESPECT TO THE E*JALURTION OF SPECIES DIVERSITY ON RECLAIMED AREAS, KERR <br />CORL IS P.EOUIRED TO WOP.K WITH THIS DIVISION TOWARDS THE ESTABLISHMENT OF <br />MUTUALLY ACCEPTABLE SDCCESS CRITERIA. SUCH CRITERIA SHALL BE FORMUTAT£D AND <br />AGREED TO NO LATER THAN SEPTEMBER 30, 1981. <br />10. WITH RESPECT TO KERB COAL'S PLAN FOR MITIGATION OF POSSIBLE IMPACTS ON SAGE <br />GROUSE, PRECISE LOCATIONS FOR FERTILIZER A.PLICATION MUST BE SUBMITTED EALB <br />YEAR TO TXE MINED ZAND RECLAMATION DIVISION FOR APPROVAL, AT LEAST 30 DAYS <br />PP.IOR TO .THE SCHEDULED FERTILIZATION DATE. SUCH APPROVAL SHALL 8d BASED ON A <br />C,.~.'PJ,RI501J (TO BE PPOVIDED BY KERR CORL) AT AREAS TD 86 FERTILIZED NITS AREAS <br />^:r 3E DZS:'.rP.3ED, ?;::.AT: JE T'J SnGE GROUSE Xi.BITAT TYPES AS SBONN QV IGIP 73. <br />:, DISCUSSION OF THESE AREAS WITH R£S7CCT TO SACE GRODSd USd AlID JICCZSST7II.l'Tf': <br />TO THE BIRDS MUST AL50 BE PROVIDED. ' <br />.,~.. <br />11. K£RR COAL IS DIRECTED TD SUBMIT TO TATS DIVISION ON A ASCD'L~IR lAjt~ d~AlA ~ ~' ^~"'. <br />FROM THE AERIAL VOLUMETRIC SURVEYING PROGRAM DESCRIBED ON PADS AItl•liI Or .'~a <br />THE APPLICATION, TO DETERMINE WHETHER FUTURE OPERATIONAL LXPERSdNCS SS <br />CONSISTENT WITS THE PROJECTED SWELL FACTOR OF 14x. <br />12. NO LATER THAN 90 DAYS PRIOR TO THE SCHEDULED COMMENCEMENT OF OPERATIONS ON <br />'73E SECOfJD 90NDING INCP.EMENT (AS SHOWN ON MAP 4b) KERR COAL MUST SUBMIT <br /> <br />-='=~=~'- +rr=" "~.". %:JY.iT7.^.fJ COST ESTIMATES TO <br />THE DIVISION FOR REVIEW. _ <br /> <br />~ <br />~ <br />11:Y r2?.-/=L •.~:: C~_O:aL t';::; ..H/,'o'" /.;,^ .?3 ;'JB.KiTiGD AND APPROVED PRIOR TD ' <br />" <br />THE COMM£NCEME'NT Vt 'iYti/+Y1a~L 'iU '!Y.l+7 Lrr.YJ.NkN'1', a ;Ja//..i.,v rri/~CDVP <br />C SHALL y~ <br />3E FGLL.^WED FOR ANY SUESEpUENT ZNCkE[dEIJ'L'S • . ~ <br />Ng~ <br />"' <br />• ~v t.. <br />~'~. <br />~~; <br />' :~,: <br />.i, r. <br />w,, ~ '. <br />