Laserfiche WebLink
,, iii iiiiiiiiiiiiiiii ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 81., Room 215 <br />Denver, CuloraAo 80203 <br />Phone 0031 866-3567 <br />FA%: (303) 832-8106 <br />To: John Nelson, Project Manager~~~~ ~~--~ <br />From: Bruce Stover'G~ -~ C/ t° " / <br />Date: May 30, 1995 <br />Re: C-81-048 TBM Project Inspection, 5/25/95 <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochheazl <br />E~eculive Director <br />Michael B Lone <br />Division Director <br />Kessler called for an Inspection of the work they lead completed during the week of 5/22/95 <br />at TBM. I arrived at the site about 12:30 pm on 5/25/95. It was raining and foggy the whole <br />way down. The job site was wet, muddy and had standing water in places, but it was clearing <br />from the south somewhat. <br />Phil Kessler and I inspected pond at task 6. We had difficulty getting up the access road due <br />to the wet, muddy conditions. The culvert had been installed under the road, and about 2/3rds <br />of the dike/dam embankment had been completed on the pond itself (photos taken). It was <br />still too muddy to gain access for installation of the other culvert for the road ditch diversion. <br />We also inspected the grading and reclamation of pond 15-P10. The embankment had been <br />removed and feathering of the reclaimed area was being done in preparation for seeding. Phil <br />indicated that they did encounter some limited areas of coaly materials, which appeared to be <br />related to two small coal stringers observed in place on the slopes above the pond to the north. <br />They covered the outcrop areas of these coal beds with topsoil materials during grading. This <br />area is ready for seeding (photos taken). <br />A synopsis of work this week: <br />Monday 5/22 worked on pond 15 P10, and installed culvert at task 6 <br />Tuesday 5/23 rained most of day...no work. <br />Wednesday 5/24 rain, drizzle all day, very muddy, no work. <br />Thursday 5/25 working pond 15-P10, ready for grading and culvert inspection. <br />Plans for Friday 5/26: weather permitting...finish dike at task 6 and install second culvert. <br />Next week they hope to do the stream realignment if the weather improves, and the site drys <br />up somewhat. They requested seed be delivered ASAP so that reveg work on the reclaimed <br />pond can be concluded. <br />I left the site at 2:30 PM. <br />