Laserfiche WebLink
• • <br />TABLE 2-7 (modified) <br />TRANSPORTATION <br />Construction Plceance S(te Pipeline Parachute Sita <br />Phase Commuter Truck Trips Commuter= Truck Trips Commuter Truck Trips <br />Proposed Action I10 33 100 10 130 66 <br />Accelerated Development Alternative 215 66 100 10 255 132 <br />Operetions Plceance Site Parechute Site <br />Phase Commute Truek Trips Commuter' Truck Trips= <br />Proposed Action 50 14 60 36 <br />Accelerated Development Alternative 115 18 I IS 44 <br />1 Peak daily trips <br />Z Average trips per day <br />Sheet 1 of 1 <br />