My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40858
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:58 PM
Creation date
11/23/2007 10:54:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
4/2/1984
Doc Name
TRAPPER MINING INCS STIPULATION RESPONSES
From
MLRD
To
SUSAN MOWRY
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getche4 Executive Director <br />iii iii i iiiiii iii <br />999 <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richard D. Lamm <br />Governor <br />DATE: April 2, 1984 <br />T0: Susan Mowry <br />FROM: Jim Pendleton <br />RE: Trapper Mining Inc.'s <br />~. <br />,i,,~ <br />pulatlon Responses <br />Pursuant to your request, I have reviewed Trapper Mining's recent submittals <br />made in response to the requirements of Stipulation No. 3, placed upon their <br />permit for the Trapper Mine. <br />Overburden Swell Verification <br />The operator has submitted a report presenting the results of a required <br />survey analysis of actual overburden swell factors within the regraded areas <br />at the Ashmore, Derringer, and Enfield Pits at the Trapper Strip Mine. The <br />detailed survey study determined that the average swell factor throughout the <br />Trapper Mine was 24.6X. Based upon results of this thorough survey-based <br />analysis, I concur with Trapper Mining's conclusion that it 1s appropriate to <br />consider their assumed 25X swell factor to be actual. Further, I recommend <br />that we delete the requirement for annual completion of a survey swell factor <br />analysis at the Trapper Mtne from their current permit. We should, however, <br />continue to require the originally stipulated annual submittal of a <br />post-mining topographic contour map for areas regraded at the Trapper Mtne. I <br />no longer believe tt is necessary to require submittal of both the map and the <br />swell factor analysis. <br />Map A -"1983 Post-Mining Contour MeD" <br />I have compared Map A, "1983 Post-Mining Contour Map", with Map M12, the <br />original permit application "Post-Mining Contour Map". In my opinion, the <br />projected and actual post-mining topographic contour appears to correlate <br />well. The operator appears to be achieving the improved character of the <br />planned post-mining topographic configuration for the mined areas at the <br />Trapper Mine. <br />The areas regraded during 1983 involve portions of the cross-sectioned <br />drainages of Johnson (Enfield Pit) and Buzzard (Derringer Pit) Gulches. I <br />recommend that you have one of the surface hydrologists on our staff review <br />these sections of the regraded topography, in order to ascertain their <br />compliance with the appropriate permit requirements. <br />/cd <br />cc: Brian Munson <br />Doc. 0459f <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (30:x) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.