Laserfiche WebLink
12-0d-1997 9:08AM FR01-0 ENG- WEST ELK t-1INE 970 9295050 p, 29 <br />NOV 6'97 15:20 FR BARR ENGINEERING 612 632 2601 TC `!'Ly~5y5--bbGbbib r.in~~r~ <br />2a Noun ~nry <br />Ftoo: P6iSp B. 9elest~ <br />9abj~e¢ We.t Elk `~:_- d --'_°de <br />Dnuc Ne.ember 8, 1887 <br />Proia~: OaY6014RW W001 Pwo 8 <br />be tested and coordinated with the use of dewatering wells near the <br />substation. The applvpriate location of the lime stabilization and the <br />RCC/soldier pile atabilizatiou methods needs to be reviewed. (i.e., the lime <br />stabiliration may be best near the ponds where the ground is heavily <br />sat~usted and the RCC/soldier pile wall may need to extend further east to <br />capture the apparent failure area east of the portal). <br /> <br /> <br />ostso14~s4ea1-vcEr <br />** TOTpL PAGE.010 ** <br />