Laserfiche WebLink
<br /> <br />the annular space between the casing and the tubing. The cement within the tubing can be <br />displaced and the tubing can be left open for future temperature observations. <br />American Soda will establish a cement plug from the C1BP or cement basket to the <br />surface on the long string 7" casing. <br />The wellheads will be salvaged and modified to allow long term TDR monitoring and to <br />facilitate partial surface reclamation. <br />This letter will serve as American Soda's 45 day notification to the EPA as to our intent to P&A <br />well 20-12. Once we receive approval of the modified P&A plan as described above, we will <br />proceed with ordering materials and scheduling equipment and crews to complete the P&A. <br />This work will be completed in the first quarter of 2004. <br />If you have any questions or concerns regarding this plan please contact me at 970-285-0407. <br />Sin r ly, <br />E~oo , <br />Environmefital Safety <br />and Health Manager <br />cc Kent Walter, Bureau of Land Management <br />Erica Crosby, Colorado Division of Minerals and Geology <br />