Laserfiche WebLink
24. EACH YEAR, A MINIMUM OF ONE (1) REPRESENTATIVE FLY ASH AND ONE (1) <br />REPRESENTATIVE BOTTOM ASH SAMPLE SHALL BE COLLECTED FROM THE BOILERS AT <br />THE GOLDEN POWER PLANT. LABORATORY ANALYSIS WILL CONSIST OF SATURATION <br />EXTRACTS AND E.P. TOXICITY TEST FOR EACH SAMPLE. ADDITIONAL FLY ASH AND <br />BOTTOM ASH SAMPLES WILL BE COLLECTED AND ANALYZED IF, AT ANY TIME, A <br />SOURCE OF COAL IS CHANGED. RESULTS OF SATURATION EXTRACTS AND TOXICITY <br />TESTS WILL BE SUBMITTED TO THE DIVISION WITHIN 15 DAYS OF ANALYSIS. <br />25. AN ANNUAL EVALUATION OF ASH DISPOSAL INCLUDING, BUT NOT LIMITED T0, SOURCE <br />OF ASH, ASH QUALITY, TOTAL AMOUNT OF ASH DISPOSED OF, AVERAGE DEPTH OF ASH <br />AND AERIAL EXTENT OF DISPOSAL AREAS, TRANSPORTATION AND DISPOSAL <br />TECHNIQUES, WATER QUALITY MONITORING DATA, AND FUTURE ASH DISPOSAL SHOULD <br />BE INCLUDED IN THE ANNUAL HYDROLOGY AND RECLAMATION REPORT. MONTHLY <br />REPORTS CONSISTING OF SOURCE OF ASH, MATERIAL QUANTITIES DISPOSED OF, <br />DEPTH OF ASH AND AERIAL EXTENT, WATER QUALITY MONITORING DATA, AND <br />DISPOSAL PROBLEMS (IF ANY) SHOULD BE MADE AVAILABLE AT THE MINE OFFICE. <br />STIPULATION N0. 26 <br />PRIOR TO RESUMPTION OF COAL EXTRACTION OR ASSOCIATED SURFACE DISTURBANCE AT <br />THE KEENESBURG MINE, THE PERMITTEE WILL OBTAIN APPROVAL OF A REVISION WHICH <br />WILL PROVIDE AN UPDATED MINING AND RECLAMATION SCHEDULE AND WHICH WILL <br />DEMONSTRATE SUFFICIENCY OF THE RECLAMATION BOND FOR THE PROJECTED WORST CASE <br />DISTURBANCE DURING THE PERMIT TERM. <br />-5- <br />