My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40748
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:53 PM
Creation date
11/23/2007 10:50:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
3/17/1992
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24. EACH YEAR, A MINIMUM OF ONE (1) REPRESENTATIVE FLY ASH AND ONE (1) <br />REPRESENTATIVE BOTTOM ASH SAMPLE SHALL BE COLLECTED FROM THE BOILERS AT <br />THE GOLDEN POWER PLANT. LABORATORY ANALYSIS WILL CONSIST OF SATURATION <br />EXTRACTS AND E.P. TOXICITY TEST FOR EACH SAMPLE. ADDITIONAL FLY ASH AND <br />BOTTOM ASH SAMPLES WILL BE COLLECTED AND ANALYZED IF, AT ANY TIME, A <br />SOURCE OF COAL IS CHANGED. RESULTS OF SATURATION EXTRACTS AND TOXICITY <br />TESTS WILL BE SUBMITTED TO THE DIVISION WITHIN 15 DAYS OF ANALYSIS. <br />25. AN ANNUAL EVALUATION OF ASH DISPOSAL INCLUDING, BUT NOT LIMITED T0, SOURCE <br />OF ASH, ASH QUALITY, TOTAL AMOUNT OF ASH DISPOSED OF, AVERAGE DEPTH OF ASH <br />AND AERIAL EXTENT OF DISPOSAL AREAS, TRANSPORTATION AND DISPOSAL <br />TECHNIQUES, WATER QUALITY MONITORING DATA, AND FUTURE ASH DISPOSAL SHOULD <br />BE INCLUDED IN THE ANNUAL HYDROLOGY AND RECLAMATION REPORT. MONTHLY <br />REPORTS CONSISTING OF SOURCE OF ASH, MATERIAL QUANTITIES DISPOSED OF, <br />DEPTH OF ASH AND AERIAL EXTENT, WATER QUALITY MONITORING DATA, AND <br />DISPOSAL PROBLEMS (IF ANY) SHOULD BE MADE AVAILABLE AT THE MINE OFFICE. <br />STIPULATION N0. 26 <br />PRIOR TO RESUMPTION OF COAL EXTRACTION OR ASSOCIATED SURFACE DISTURBANCE AT <br />THE KEENESBURG MINE, THE PERMITTEE WILL OBTAIN APPROVAL OF A REVISION WHICH <br />WILL PROVIDE AN UPDATED MINING AND RECLAMATION SCHEDULE AND WHICH WILL <br />DEMONSTRATE SUFFICIENCY OF THE RECLAMATION BOND FOR THE PROJECTED WORST CASE <br />DISTURBANCE DURING THE PERMIT TERM. <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.