My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40706
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:50 PM
Creation date
11/23/2007 10:49:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
1/25/1984
Doc Name
MINING PERMIT (Dated 1/25/84 to 1/25/89)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-8- <br />Stipulation No. Z1 <br />THE PERMITTEE SHALL SUBMIT AN ACCEPTABLE ANNUAL OR BIENNIAL REVEGETATION <br />MONITORING PLAN TO BE INITIATED UPON DIVISION APPROVAL. THIS PLAY SHALL <br />BE SUBMITTED TO THE DIVISION AS A REVISION NO LATER THAN 12 MOf1THS AFTER <br />PERMIT ISSUANCE. <br />Stipulation No. 22 <br />WITHIN 120 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL SUBMIT A REVISED <br />BACKFILLING ANO GRADING PLAN, INCLUDING A REVISED CONTOUR MAP ANO <br />CROSS-SECTIONS OF THE P05T-MINING TOPOGRAPHY. THE PROPOSED POST-h1INING <br />TOPOGRAPHY SHALL COMPLY WITH THE REQUIREMENTS OF APPROXIMATE ORIGINAL <br />CONTOUR AND SHALL ELIMINATE ALL DEPRESSIONS. IN ADDITION, THE REVISED <br />CROSS-SECTIONS SNALL SHOW THE PRE-MINING TOPOGRAPHY. THIS PLAN WILL BE <br />SUBMITTED AS A REVISION TO THE PERMIT. <br />Stipulation No. 23 <br />WITHIN 120 DAYS OF PERMIT APPROVAL, THE PERMITTEE MUST EITHER; A) SUBt1IT <br />A PLAN TO THE DIVISION FOR DEMONSTRATING THAT SUCCESSFUL REVEGETATION <br />CAN BE ACHIEVED WITH LESS THAN FOUR FEET OF THE BEST AVAILABLE <br />NON-TOXIC, NON-COMBUSTIBLE CODER MATERIAL; OR B) SUBMIT A PLAN FOR <br />RECLAMATIOPJ OF THE WASTE DISPOSAL PILE USING FOUR FEET OF THE BEST <br />AVAILABLE NON-TOXIC, NON-COMBUSTIBLE COVER MATERIAL. THIS PLAN MUST <br />INCLUDE A DESCRIPTION OF THE FOUR FEET OF COVER MATERIAL TO BE USED <br />INCLUDING, AT A MINIMUM, SOURCE AND GEOCHEMICAL CHARACTERISTICS. <br />EITHER PLAN WILL BE SUBMITTED AS A REVISION, SUBJECT TO APPROVAL BY THE <br />DIVISION AND WILL BE IMPLEMENTED BY THE PERMITTEE DURING THE RECLAi'IATION <br />OF THE PILE. <br />Stipulation No. 24 <br />WITHIN 30 DAYS OF PERMIT APPROVAL, THE PERMITTEE MUST SUBMIT EITHER A <br />PLAN TO BRING THE ACCESS ROAD INTO COMPLIANCE WITH THE CULVERT SPACING <br />REQUIREMENTS OF RULE 4.03.2(4)(e)(V)(A) UR A REQUEST TO USE ALTERNATE <br />CULVERT SPACING SPECIFICATIONS IN ACCORDANCE WITH RULE 4.03.2(4)(e)(U). <br />IF THE PERMITTEE REQUESTS THAT ALTERNATE SPECIFICATIONS BE USED, THE <br />REQUEST MUST INCLUDE A DEMONSTRATION THAT THE ALTERNATE SPECIFICATIUNS <br />WILL NOT RESULT IN INCREASED EROSION. EITHER PLAN WILL BE SUBMITTED A5 <br />A REVISION TO THE PERMIT. <br />Stipulation No. 25 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST EITHER SUBMIT <br />EVIDENCE TO THE DIVISION THAT THE EXISTING PURGATOIRE RIVER CULVERTS ARE <br />CAPABLE OF PASSING THE PEAK FLOW FROM A 20-YEAR, 24-HOUR PRECIPITATION <br />EVENT, OR SUBMIT A SCHEDULE, AS A REVISION TO THE PERMIT, ACCEPTABLE TO <br />THE DIVISION, FOR CONSTRUCTION OF THE PURGATOIRE RIVER BRIDGE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.