My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40706
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:50 PM
Creation date
11/23/2007 10:49:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
1/25/1984
Doc Name
MINING PERMIT (Dated 1/25/84 to 1/25/89)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-6- <br />Stipulation No. 15 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST INDICATE ON i4AP 3 <br />WHICH SOIL HORIZON IS STORED IN EACH STOCKPILE. THE PERMITTEE MUST <br />IDENTIFY EACH STOCKPILE WITH 9N APPROPRIATE MARKER. <br />Stipulation No. 16 <br />WITHIN 12 idONTHS OF PERMIT ISSUANCE, THE PERMITTEE P4UST PROVIDE THE <br />DIVISION WITH A PLAN FOR THE REDISTRIBUTION OF TOPSOIL AT THE MAXWELL <br />MINE. THIS PLAN MUST INDICATE, WITH REASONABLE SPECIFICITY, THOSE AREAS <br />WHICH WILL RECEIVE TOPSOIL DURING REDISTRIBUTION AND THE RELATIVE DEPTHS <br />OF TOPSOIL AND SUBSOIL WHICH WILL BE REPLACED ON THESE AREAS. THE <br />TOPSOIL MATERIAL MUST BE REPLACED WHEN IT IS IN A RELATIVELY DRY <br />CONDITION. THIS PLAN WILL BE SUBMITTED AS A REVISION TO THE PERi4IT. <br />Stipulation No. 17 <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE A PLAN <br />TO THE DIVISION FOR THE RECLAMATION OF ALL DISTURBED SURFACE LANDS WHICH <br />'WILL NOT BE RETOPSOILED DURING RECLAMATION. THIS PLAN MUST INCLUDE <br />ANALYSES OF AN APPROPRIATE NUMBER OF SAMPLES OF THE DISTURBED MATERIAL <br />TO DEMONSTRATE SUITABILITY OF THE iM TERIAL TO A DEPTH OF 40 INCHES ON <br />THE BASIS OF TEXTURE, pH, ELECTRICAL CONDUCTIVITY, BAR, SATURATION <br />PERCENTAGE, PERCENT ORGANIC MATTER, SELENIUM, AND BORON. THE PLAN MUST <br />ALSO INCLUDE APPROPRIATE MEASURES WHICH WILL BE EMPLOYED DURING - <br />PREPARATION OF THE DISTURBED SURFACE PRIOR TO SEEDING (i.e., REDUCTION <br />OF COMPACTION). <br />IF THE ANALYSES OF THE IN-PLACE MATERIAL INDICATE THAT SUCCESSFUL <br />REVEGETATION CANNOT BE ATTAINED, THE PERMITTEE MUST PROPOSE A PLAN TU <br />APPLY APPROPRIATE AMENDMENTS TO MAKE IT SUITABLE OR IMPORT SUITABLE <br />MATERIAL. IF AMENDMENTS OTHER THAN NITROGEN, PHOSPHORUS, POTASSIUM, <br />SULFUR, OR IRON ARE REQUIRED, THE PERMITTEE MUST SUBMIT THE RESULTS OF <br />APPROPRIATE TESTS TO PROVE THE AMENDMENT MATERIAL IS SUITABLE FOR <br />REVEGETATION. THIS PLAN WILL BE SUBMITTED AS A REVISION TO THE PERtdIT. <br />Stipulation No. 18 <br />THE PERMITTEE SHALL SUBMIT TO THE DIVISION A TABLE OF THE ACTUAL AND <br />PROPOSED ACREAGES OF DISTURBANCE FOR EACH VEGETATION TYPE AT THE MAXWELL <br />MINE WITHIN 30 DAYS OF PERMIT ISSUANCE. IF THE PINYON-JUfJIPER <br />VEGETATION COMMUNITY COMPRISES 5 PERCENT OR LESS OF THE AFFECTED <br />ACREAGE, rID SAMPLING WILL BE REQUIRED. IF SAMPLING IS REQUIRED, A PLAN <br />MUST BE SUBMITTED TO THE DIVISION AS A REVISION TO THE PERMIT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.